Installer Instructions for AlphaEclipse 3600 Signs (Form no. 9711-8028B)
February 14, 2006
4
2
Mount signs (continued)
Multiple section sign assembly
NOTE:
These instructions only apply to large signs that are shipped from the factory in multiple sections. These
sections must then be assembled into a single sign at the installation site.
Vertical split or horizontal split assembly
Vertical and horizontal split assembly
Lift signs into place and assemble
Left
Right
Top
Bottom
For a vertically split sign, see “Multiple section
sign, vertical split assembly” on page 16.
For a horizontally split sign, see “Multiple section
sign, horizontal split assembly” on page 18.
Top Right
Top Left
Bottom Right
Bottom Left
For a sign that is split both vertically and
horizontally, see “Multiple section sign, vertical/
horizontal split (sheet 1 of 2)” on page 20.
RECOMMENDED
Lifting ba
r
NOT RECOMMENDED
See the shop drawings on page 10
for detailed sign mounting
See “Temperature probe mounting”
on page 24 for information on the
optional temperature probe.