![background image](http://html1.mh-extra.com/html/acv/smart-sl-100/smart-sl-100_installation-operation-and-maintenance_2845568030.webp)
Cold water
Hot water
Vertical installation
on a wall
Horizontal installation
on a wall
Horizontal installation
on a wall
2
4
2
3
1
1
Figure 1
Figure 2
Vertical installation
on a wall
FILLING THE PRIMARY CIRCUIT (Figure 2)
General remark
•
If the tank is used within a heating system, refer to the heating boiler manual.
1.
Check that the drain valve (
3
) of your primary circuit is tightly closed.
2. Open the stop valves (
1
) and (
2
) of the primary circuit connected to the heating boiler.
3. Open the air bleed valve (
4
) located on the top of the hot water tank.
4. When the air is eliminated, close the air bleed valve (
4
). Make sure the air bleed valve
is tight.
(SL only)
Smart SL-SLEW
: A1007850 - 661Y1700 • F - draft
Starting Up
EN
30
Содержание Smart SL 100
Страница 5: ...ENERGY LABELLING Smart SL SLEW A1007850 661Y1700 F draft Product Information 5 EN...
Страница 6: ...Smart SL SLEW A1007850 661Y1700 F draft Product Information RATING PLATE EN 6...
Страница 37: ...Smart SL SLEW A1007850 661Y1700 F draft 37 EN...
Страница 38: ...Smart SL SLEW A1007850 661Y1700 F draft EN 38...
Страница 39: ...Smart SL SLEW A1007850 661Y1700 F draft 39 EN...
Страница 40: ......