background image

T E C H N I C A L   A N D   I N S T A L L A T I O N  

 

6

Immersion Heater

 

 
The SmartLineE range of tanks have the facility for fitting a 3kW immersion heater for back-up emergency use 
when the primary heating fails not as a permanent form of summer time heating, this heater must be wired to 
its own 13 Amp fused spur and as described in the installation instructions for Thermco immersion heaters. 

 
Installation Instructions for Thermco Immersion Heaters. 
 
Contact details: www.thermco.com - [email protected] - 01502 576800 
 

1.

 

Ensure mains voltage corresponds to the voltage rating of the heater as shown on the rating label 
on the terminal cover. 

2.

 

Install the heater into the water tank, using the gasket or ‘O’ ring supplied (the use of sealing 
compounds is not recommended). Use a shaped spanner to tighten (stillsons should not be used). 

3.

 

It is essential that water fully covers the heating element to a depth of at least 100mm. Under no 
circumstances must the heater be permitted to run dry – serious damage may result to the heater 
in addition to danger of personal injury and damage to property. 

4.

 

Check for possible leakage before wiring.  

5.

 

Wire the heater in accordance with the diagram below. The heater should be wired through a 
double  pole  isolating  switch  or  controller,  having  contact  separation  of  at  least  3mm  using 
1.5sqmm flexible cable, 85°C rubber insulated HOFR sheathed, complying with BS6141 Table 8. It 
must be fully earthed. Ensure all terminals are securely made, however do not use excessive force 
when tightening. 

6.

 

In the event of the manually resettable cut out operating, isolate the heater from the mains, 
investigate and identify the cause of cut out, rectify before resetting and then re-energise the 
heater. Replace the terminal cover securely before re-energizing.  

7.

 

If problems continue replace the thermostat(s). 

8.

 

All heaters conform to EEC directive 76/889 for radio interference and comply with BS 800:1977.

 

 

 

 

 

WARNING! 

UNDER NO CIRCUMSTANCES CAN THE IMMERSION HEATER BE SWITCHED ON BEFORE THE 

PRIMARY TANK IS FILLED. SERIOUS DAMAGE MAY RESULT TO THE HEATER IN ADDITION TO 

DANGER OF PERSONAL INJURY AND DAMAGE TO PROPERTY

 

IF HEATER IS SWITCHED ON WHEN 

DRY. 

4.

 

SYSTEM SCHEMATICS

 

Typical un-vented application 

BEAB

APPROVED

Heater Series

A*D, B*D, C*D, D*D

(*may be either A,E or F)

Heater Series

A*S, B*S, C*S, D*S

(*may be either A,E or F)

Содержание SLE Plus 210

Страница 1: ...SLE130 160 SLE 210 240 300 ADDITIONAL INSTALLATION INSTRUCTION FOR UK KITS IMPORTANT DO NOT UNDER ANY CIRCUMSTANCES SWITCH ON THE IMMERSION HEATER BEFORE THE PRIMARY TANK IS FILLED SLE 040113...

Страница 2: ...rk Dalgety Bay Fife KY11 9PF Scotland Further copies of instructions can be downloaded at www acv com Manufactured at ACV International Kerkplein 39 B 1601 Ruisbroek Belgium Telephone 0032 237 81235 e...

Страница 3: ...rsion Heater 6 4 System Schematics Typical un vented 7 Typical open vented 7 Proposed SLE diverted primary 8 Proposed SLE radiators and UFH 8 Typical S Plan electrical 9 Typical Y Plan electrical 10 5...

Страница 4: ...crushing damage to the domestic tank IMPORTANT ACV recommends the use of a corrosion inhibitor in the primary heating system The warranty will be invalidated if upon inspection it is found that a tan...

Страница 5: ...c water for use at the sanitary hot water outlets The exterior tank B is manufactured from STW 22 carbon steel this tank holds the primary heating fluid which is circulated from the boiler as the prim...

Страница 6: ...olyurethane foam 50mm thick Containing no CFC s having a GWP 0 00025 and ODP 0 Jacket The tank is covered in a co polymer polypropylene jacket this is a plastic material that offers a high resistance...

Страница 7: ...k plastic plug from Check Expansion valve and fit Expansion Vessel seal with PTFE tape 7 Connect Temperature and Pressure relief valve to 1 2 connection and orientate into position Do not run drain di...

Страница 8: ...ages 12 13 ACV recommends that the cylinder is electrically cross bonded to earth Primary system connections The primary flow and return connections to the tank should be made using the appropriate si...

Страница 9: ...roperty 4 Check for possible leakage before wiring 5 Wire the heater in accordance with the diagram below The heater should be wired through a double pole isolating switch or controller having contact...

Страница 10: ...T E C H N I C A L A N D I N S T A L L A T I O N 7 Typical open vented application Proposed SLE schematics...

Страница 11: ...d Primary Flow SLE Radiators and Under floor Typical S Plan schematic At high DHW demand or DHW charging Heat Pump can operate at elevated temperature 45 55 C and flow is diverted to top inlet During...

Страница 12: ...TIONS SUPPLIED WITH YOUR CONTROL PACKAGE EARTH CONNECTION IS NOT REQUIRED WITH MYSON ZONE VALVE FITTING INSTRUCTIONS INCLUDED WITH VALVE THIS DIAGRAM IS FOR GUIDANCE ONLY ACV ACCEPT NO LIABILITY FOR D...

Страница 13: ...TERMINAL NUMBERING MAY DIFFER FROM THOSE SHOWN ALWAYS WITH YOUR CONTROL PACKAGE EARTH CONNECTION IS NOT REQUIRED WITH MYSON ZONE VALVE FITTING INSTRUCTIONS INCLUDED WITH VALVE THIS DIAGRAM IS FOR GUI...

Страница 14: ...recommends the use of a corrosion inhibitor in the primary heating system The warranty will be invalidated if upon inspection it is found that a tank has failed due to corrosion caused by the lack of...

Страница 15: ...v Replace strainer and push cartridge into valve body take care when screwing the cartridge in not to damage the threads Do not over tighten vi Close hot tap and slowly open the cold water isolating v...

Страница 16: ...r connection 1 BSP 1 BSP Primary fluid connections 1 BSP 1 BSP Domestic water connections BSP BSP Dimension A mm 1024 1222 B mm 234 234 C mm 759 959 D mm 234 234 Mains kit will add approximately 500mm...

Страница 17: ...r 37 45 51 Immersion heater connection 1 BSP 1 BSP 1 BSP Primary fluid connections 1 BSP 1 BSP 1 BSP Domestic water connections BSP BSP BSP Dimension A mm 1493 1741 2046 B mm 1230 1477 1783 C mm 937 1...

Страница 18: ...EQUIREMENT there shall be precautions to ensure that the hot water discharged from safety devices is safely conveyed to where it is visible but will not cause danger to persons in or about the buildin...

Страница 19: ...levant part of BS 7291 3 58 The discharge pipe D2 should be at least one pipe size larger than the nominal outlet size of the safety device unless its total equivalent hydraulic resistance exceeds tha...

Страница 20: ...e below a fixed grating and above the water seal c downward discharges at low level i e up to 100mm above external surfaces such as car parks hard standings grassed areas etc are acceptable providing...

Страница 21: ...p to 27m 0 8m 1 0m 1 4m G 22mm 28mm 35mm 42mm Up to 9m Up to 8m Up to 27m 1 0m 1 4m 1 7m G1 28mm 35mm 42mm 54mm Up to 9m Up to 8m Up to 27m 1 4m 1 7m 2 3m Worked example of discharge pipe sizing Fig 5...

Страница 22: ...ength of 28mm pipe D2 from a G1 2 temperature relief valves equates to 18m Subtract the resistance of 4 No 28mm elbows at 1 0m each 4 0m Therefore the maximum permitted length equates to 14m As the ac...

Страница 23: ...T E C H N I C A L A N D I N S T A L L A T I O N 20...

Отзывы: