T E C H N I C A L A N D I N S T A L L A T I O N
9
Typical ‘Y-Plan’ schematic.
CONTROL TERMINAL NUMBERING MAY
DIFFER FROM THOSE SHOWN. ALWAYS
REFER TO THE INSTRUCTIONS SUPPLIED
WITH YOUR CONTROL PACKAGE.
EARTH CONNECTION IS NOT REQUIRED
WITH MYSON ZONE VALVE, FITTING
INSTRUCTIONS INCLUDED WITH VALVE.
THIS DIAGRAM IS FOR GUIDANCE ONLY.
ACV ACCEPT NO LIABILITY FOR DAMAGE
TO EQUIPMENT ARISING FROM ERRORS
OR OMISSIONS INADVERTENTLY
CONTAINED WITHIN THIS DIAGRAM.
ACV 6 PIN SOCKET
FACTORY WIRED
N IS SWITCHED LIVE
NOT NEUTRAL