background image

T E C H N I C A L   A N D   I N S T A L L A T I O N  

INTRODUCTION 

 
Intended users of these instructions: 

-

 

The specifying engineer. 

-

 

The installation engineer. 

-

 

The owner or user. 

-

 

The service engineer. 

 

Warnings. 

 

THE INSTALLER MUST READ AND UNDERSTAND THIS MANUAL BEFORE FITTING THIS 
APPLIANCE. 
 
IMPORTANT: Do not under any circumstances switch on the immersion heater before the 
primary tank is filled.  
Serious damage may result to the heater in addition to danger of personal injury and damage 
to property if the heater is switched on when dry. 
 
IMPORTANT: Always isolate electrical supplies and if necessary the water supply before 
working on the unit. 

 

IMPORTANT: Always fill and pressurise the secondary (domestic) tank first, filling and 
pressurising the primary (heating) tank may result in crushing damage to the domestic tank. 

 

IMPORTANT: ACV recommends the use of a corrosion inhibitor in the primary (heating) 
system. The warranty will be invalidated if upon inspection it is found that a tank has failed 
due to corrosion caused by the lack of an inhibitor. 
 
IMPORTANT: Ensure that the air is purged from the primary jacket using the air vent on the top 
centre of the cylinder. 
 

These instructions form an integral part of the equipment to which they refer and the user must 
be provided with a copy. 
 
The product must be installed and serviced by qualified engineers, in compliance with current 
standards. 
 
ACV cannot accept liability for any damage resulting from incorrect installation or from the use of 
components or fittings not specified by ACV. 
 
Any failure to follow the instructions regarding tests and test procedures may result in personal 
injury. 
 
ACV reserves the right to change the technical specifications and components of its products 
without prior notice. 

 
 

Содержание SLE Plus 210

Страница 1: ...SLE130 160 SLE 210 240 300 ADDITIONAL INSTALLATION INSTRUCTION FOR UK KITS IMPORTANT DO NOT UNDER ANY CIRCUMSTANCES SWITCH ON THE IMMERSION HEATER BEFORE THE PRIMARY TANK IS FILLED SLE 040113...

Страница 2: ...rk Dalgety Bay Fife KY11 9PF Scotland Further copies of instructions can be downloaded at www acv com Manufactured at ACV International Kerkplein 39 B 1601 Ruisbroek Belgium Telephone 0032 237 81235 e...

Страница 3: ...rsion Heater 6 4 System Schematics Typical un vented 7 Typical open vented 7 Proposed SLE diverted primary 8 Proposed SLE radiators and UFH 8 Typical S Plan electrical 9 Typical Y Plan electrical 10 5...

Страница 4: ...crushing damage to the domestic tank IMPORTANT ACV recommends the use of a corrosion inhibitor in the primary heating system The warranty will be invalidated if upon inspection it is found that a tan...

Страница 5: ...c water for use at the sanitary hot water outlets The exterior tank B is manufactured from STW 22 carbon steel this tank holds the primary heating fluid which is circulated from the boiler as the prim...

Страница 6: ...olyurethane foam 50mm thick Containing no CFC s having a GWP 0 00025 and ODP 0 Jacket The tank is covered in a co polymer polypropylene jacket this is a plastic material that offers a high resistance...

Страница 7: ...k plastic plug from Check Expansion valve and fit Expansion Vessel seal with PTFE tape 7 Connect Temperature and Pressure relief valve to 1 2 connection and orientate into position Do not run drain di...

Страница 8: ...ages 12 13 ACV recommends that the cylinder is electrically cross bonded to earth Primary system connections The primary flow and return connections to the tank should be made using the appropriate si...

Страница 9: ...roperty 4 Check for possible leakage before wiring 5 Wire the heater in accordance with the diagram below The heater should be wired through a double pole isolating switch or controller having contact...

Страница 10: ...T E C H N I C A L A N D I N S T A L L A T I O N 7 Typical open vented application Proposed SLE schematics...

Страница 11: ...d Primary Flow SLE Radiators and Under floor Typical S Plan schematic At high DHW demand or DHW charging Heat Pump can operate at elevated temperature 45 55 C and flow is diverted to top inlet During...

Страница 12: ...TIONS SUPPLIED WITH YOUR CONTROL PACKAGE EARTH CONNECTION IS NOT REQUIRED WITH MYSON ZONE VALVE FITTING INSTRUCTIONS INCLUDED WITH VALVE THIS DIAGRAM IS FOR GUIDANCE ONLY ACV ACCEPT NO LIABILITY FOR D...

Страница 13: ...TERMINAL NUMBERING MAY DIFFER FROM THOSE SHOWN ALWAYS WITH YOUR CONTROL PACKAGE EARTH CONNECTION IS NOT REQUIRED WITH MYSON ZONE VALVE FITTING INSTRUCTIONS INCLUDED WITH VALVE THIS DIAGRAM IS FOR GUI...

Страница 14: ...recommends the use of a corrosion inhibitor in the primary heating system The warranty will be invalidated if upon inspection it is found that a tank has failed due to corrosion caused by the lack of...

Страница 15: ...v Replace strainer and push cartridge into valve body take care when screwing the cartridge in not to damage the threads Do not over tighten vi Close hot tap and slowly open the cold water isolating v...

Страница 16: ...r connection 1 BSP 1 BSP Primary fluid connections 1 BSP 1 BSP Domestic water connections BSP BSP Dimension A mm 1024 1222 B mm 234 234 C mm 759 959 D mm 234 234 Mains kit will add approximately 500mm...

Страница 17: ...r 37 45 51 Immersion heater connection 1 BSP 1 BSP 1 BSP Primary fluid connections 1 BSP 1 BSP 1 BSP Domestic water connections BSP BSP BSP Dimension A mm 1493 1741 2046 B mm 1230 1477 1783 C mm 937 1...

Страница 18: ...EQUIREMENT there shall be precautions to ensure that the hot water discharged from safety devices is safely conveyed to where it is visible but will not cause danger to persons in or about the buildin...

Страница 19: ...levant part of BS 7291 3 58 The discharge pipe D2 should be at least one pipe size larger than the nominal outlet size of the safety device unless its total equivalent hydraulic resistance exceeds tha...

Страница 20: ...e below a fixed grating and above the water seal c downward discharges at low level i e up to 100mm above external surfaces such as car parks hard standings grassed areas etc are acceptable providing...

Страница 21: ...p to 27m 0 8m 1 0m 1 4m G 22mm 28mm 35mm 42mm Up to 9m Up to 8m Up to 27m 1 0m 1 4m 1 7m G1 28mm 35mm 42mm 54mm Up to 9m Up to 8m Up to 27m 1 4m 1 7m 2 3m Worked example of discharge pipe sizing Fig 5...

Страница 22: ...ength of 28mm pipe D2 from a G1 2 temperature relief valves equates to 18m Subtract the resistance of 4 No 28mm elbows at 1 0m each 4 0m Therefore the maximum permitted length equates to 14m As the ac...

Страница 23: ...T E C H N I C A L A N D I N S T A L L A T I O N 20...

Отзывы: