background image

7

Select an official installer to do the maintenance after 1 year of
operation. This installer can, depending of the inspection and
installation circumstances, determine the interval for future
maintenance.

Pull the plug. Remove the siphon, clean it, refill it with water and
mount it again.

Remove the inspection panel from the cover on top of the boiler.

Remove the connectors from the fan and the gas valve.

Unscrew the brass gas coupling near the gas valve.

Unscrew the four M5 nuts, which fix the fan to the burner hood.
Now the fan can be removed complete with gas valve and
venturi.

Unscrew the 8 nuts M6 of the burner hood en remove the burner
hood.

Now the burner can be removed. Inspect the fire chamber and
the burner. The burner can be cleaned with a nylon brush (never
use a steel brush) on the inside (so not on the side of the flame!)

Replace the burner hood gasket if necessary.

To finish mount all parts in reverse order.

Pay attention to the right position of the burner, burner hood and
fan.

Light the boiler and check the %CO

2

both at max load and min

load. If necessary re-adjust the %CO

2

(see procedure at page 10)

Resistance table temperature sensors

The manufacturer may change parts of this manual without prior
notice.

MAINTENANCE

Temp. °C

Temp. °C

-20

98200

40

6650

-15

75900

45

5520

-10

58800

50

4610

-5

45900

55

3860

0

36100

60

3250

5

28600

65

2750

10

22800

70

2340

15

18300

75

1940

20

14700

80

1710

25

12000

85

1470

30

9800

90

1260

35

8050

95

1100

100

950

Содержание Prestige 47

Страница 1: ...66400400 excellence in hot water Prestige 47 64 85 Installation Operating and Servicing Instructions...

Страница 2: ...h the prevailing standards ACV accepts no liability for any damage resulting from incorrect installation or from the use of components or fittings not specified by ACV Failure to observe instructions...

Страница 3: ...l heating situations For more information take contact with our local distributor MOUNTING BOILER The boiler should be installed in accordance with all the local and regional regulations 1 The boiler...

Страница 4: ...t by turning the white plastic screw on the gas valve clockwise higher CO2 counter clockwise lower CO2 In case the installation is supplied with a different type of gas the boiler has to be re adjuste...

Страница 5: ...n USING THE BOILER Your system should be serviced at least once a year by a qualified engineer If the boiler is subject to heavy use it may require servicing more than once a year consult your service...

Страница 6: ...b52 T5 T5max b61 airflowsensor closed b65 wait for fanstart Internal control Burner on for holding boiler warm Burner high function Testmode max RPM in CH mode Burner low function Testmode min RPM in...

Страница 7: ...sensor NTC2 check that the shunt pump is operating and if so vent the boiler if the fan is turning check the PWM connection if the problem persists after 2 resets change the fan if the problem persist...

Страница 8: ...e the burner hood Now the burner can be removed Inspect the fire chamber and the burner The burner can be cleaned with a nylon brush never use a steel brush on the inside so not on the side of the fla...

Отзывы: