2
3
1
4
1
8
2
6
1
10
11
5
7
9
When you use an ACV control or a control of a different make, please assure that you
have adjusted the starting temperature of the heating pump (3) above 43°C.
en
28
N 2 Condens :
664Y5000 • C
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
System with circulator, mixing valve and regulator ensuring the DHW yield
1. Heating isolating valve
2. Check valve
3. Installation heating pump
4. Motorised mixing valve
5. 3 bar safety group
6. Primary circuit filling valve
7. Heating expansion vessel
8. Drain valve
9. Auto-air vent
10. DHW yield regulator
11. Room thermostat
FUEL OIL CONNECTION
General comments
The fuel oil connection must be made in accordance with the local applicable
standards.
Important safety recommendations
Refer to the technical characteristics and safety instructions provided in the
technical manual of the burner. Failure to comply with these instructions may
damage the installation or cause serious or fatal injuries.
Содержание N2 CONDENS
Страница 21: ...5 6 1 2 3 4 en 21 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU INSTALLATION BOILER PREPARATION...
Страница 22: ...10 11 7 1 2 8 9 en 22 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU INSTALLATION...
Страница 23: ...1 2 3 90 mm 4 5 6 7 8 en 23 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU FITTING THE BURNER INSTALLATION...
Страница 35: ...en 35 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU...
Страница 36: ...en 36 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU...