en
16
N 2 Condens :
664Y5000 • C
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
HOW TO MOVE THE BOILER
Move using a hand truck
Use a hand truck suitable for the weight of the boiler.
Minimum door and hall width required to pass the boiler through
Width of corridor:
Example of calculation in order to determine the minimum hall width with a door width
of D = 800 mm
C =
540
x 1000 = Hall width ≥ 675 mm
800
Width of door:
Example of calculation in order to determine the minimum door width with a hall width
of C = 900 mm
D =
540
x 1000 = Hall width ≥ 600 mm
900
C
B
A
D
A = maximum boiler width
B = maximum boiler length
C = door width
D = hall width
C =
A
x B
D
D =
A
x B
C
Содержание N2 CONDENS
Страница 21: ...5 6 1 2 3 4 en 21 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU INSTALLATION BOILER PREPARATION...
Страница 22: ...10 11 7 1 2 8 9 en 22 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU INSTALLATION...
Страница 23: ...1 2 3 90 mm 4 5 6 7 8 en 23 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU FITTING THE BURNER INSTALLATION...
Страница 35: ...en 35 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU...
Страница 36: ...en 36 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU...