T2
S3
T1
N
L1
B4
T6
T7
B5
T8
M
1
N
PE
230 V ~ 50HZ
L1
t
C
1
2
3
t
2
4
5
T2
S3
T1
N
L1
B4
T6
T7
B5
T8
en
24
N 2 Condens :
664Y5000 • C
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
ELECTRICAL CONNECTION
Key
1. Installation heating pump
2. Room thermostat
3. Flue gas safety thermostat for synthetic flue pipe
4. Link (to be removed before connecting the room thermostat
➋
)
5. Link (to be removed before connecting the flue gas safety thermostat
➌
)
Содержание N2 CONDENS
Страница 21: ...5 6 1 2 3 4 en 21 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU INSTALLATION BOILER PREPARATION...
Страница 22: ...10 11 7 1 2 8 9 en 22 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU INSTALLATION...
Страница 23: ...1 2 3 90 mm 4 5 6 7 8 en 23 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU FITTING THE BURNER INSTALLATION...
Страница 35: ...en 35 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU...
Страница 36: ...en 36 N 2 Condens 664Y5000 C EN FR NL ES IT DE PL RU...