8
Plate Heat Exchanger Kits
IMPORTANT POINTS
Before commencing installation:
When frame mounting:
• The frames must stand on a flat and level floor of suitable load
bearing capacity.
• When using a frame and header kit, the header must be bolted to
the frame before the hoses are connected to the boiler.
MOUNTING FRAME MUST BE SECURED TO
THE FLOOR WITH BOLTS
These Installations refer to perpendicular wall and floor. If walls are
not perpendicular, it is recommended that a frame and header kit be
used. The correct number of frames and headers should be ordered.
Allowances must be made for installation where features are in place
that may affect the nominal installation conditions.
Содержание EVO S 100
Страница 21: ...21 Plate Heat Exchanger Kits NOTES...
Страница 22: ...22 Plate Heat Exchanger Kits NOTES...
Страница 23: ...23 Plate Heat Exchanger Kits NOTES...