ii
Table of Contents
Section VI: Installing Vent / Combustion Air & Condensation Drain .................................................................................15
6.1
Installing Vent & Combustion Air...............................................................................................................................15
6.2
Installing Condensate Drain Assembly ......................................................................................................................15
Section VII: Gas Piping............................................................................................................................................................16
7.1
Gas Supply Piping Connection ..................................................................................................................................16
7.2
Natural Gas.................................................................................................................................................................17
7.3
Propane Gas ...............................................................................................................................................................18
Section VIII: Internal Wiring....................................................................................................................................................19
8.1
General Requirements ...............................................................................................................................................19
Section IX: External Wiring .....................................................................................................................................................20
9.1
Installation Compliance .............................................................................................................................................20
9.2
Line Voltage Connections...........................................................................................................................................20
9.3
Circulator Maximum Current Rating .........................................................................................................................20
9.4
Central Heating (CH) Circulator ................................................................................................................................20
9.5
DHV Circulator for Optional SMART/COMFORT I.F.W.H............................................................................................20
9.6
System Circulator - Zone Valve Application...............................................................................................................20
9.7
Low Voltage Connections ...........................................................................................................................................20
9.8
Thermostat (Dry Contact) Wiring..............................................................................................................................21
9.9
Outdoor Temperature Sensor Wiring.........................................................................................................................21
9.10 SMART/COMFORT Aquastat Wiring ..........................................................................................................................21
Section X: Startup Preparation ..............................................................................................................................................24
10.1 Check Boiler System Water Chemistry......................................................................................................................24
10.2 Flush Boiler System to Remove Sediment ................................................................................................................24
10.3 Use of Antifreeze in the Boiler System.......................................................................................................................24
10.4 Filling the Boiler System ............................................................................................................................................24
10.5 Check Low Water Cut Off ...........................................................................................................................................25
10.6 Check for Gas Leaks...................................................................................................................................................25
10.7 Check Thermostat Circuit..........................................................................................................................................25
10.8 Inspect Condensate Drain Assembly.........................................................................................................................25
Section XI: Startup Procedures..............................................................................................................................................26
11.1
Final Checks Before Startup ......................................................................................................................................26
11.2 CHALLENGER Startup ...............................................................................................................................................26
11.3 CHALLENGER Startup Troubleshooting....................................................................................................................26
11.4 Check the CHALLENGER and System .......................................................................................................................26
11.5 Appliance ON/OFF .....................................................................................................................................................27
11.6 Set Boiler Maximum Central Heating (CH) Set Point Temperature .........................................................................27
11.7 Operation Verification - Space Heating .....................................................................................................................27
11.8 Control Display ...........................................................................................................................................................29
11.9 Setting the Appliance Parameters.............................................................................................................................31
11.10 Error Mode..................................................................................................................................................................32
11.11 Error Codes.................................................................................................................................................................33
11.12 Warning Codes ...........................................................................................................................................................33
Содержание CC105s
Страница 62: ...57 19 Notes Section XIX Notes ...
Страница 63: ...58 19 Notes ...