ActronAir
is constantly seeking ways to improve the design of its products. Therefore, specifications are subject to change without notice.
Copyright © 2017 Actron Engineering Pty. Ltd.
Page 15 of 20
MAINTENANCE FREQUENCY CHECKLIST
Regular servicing of equipment by a qualified technician is recommended every 12 months for residential applications
and every quarter for commercial applications. Regular servicing of your unit helps in maintaining its optimum
performance and reliability.
The following checklist and service periods are provided as a guide only,
as some sites may require more frequent servicing
.
Electrical
Parts
Service Period
Detail of Service Check
Service Methods
1
Mth
3
Mth
6
Mth
1
Yr
2
Yrs
3
Yrs
4
Yrs
5
Yrs
Isolators / Printed
Circuit Boards
Visual Inspection
Tighten Terminals as necessary on
isolators and printed circuit boards
Electrical
Connections
Check all electrical
terminals, mains,
communications, etc
Re-tighten if loose.
Magnetic
Contactor
Check for loose terminal
connections.
Tighten electrical terminals.
Remove any dust.
Indoor Section
Parts
Service Period
Detail of Service Check
Service Methods
1
Mth
3
Mth
6
Mth
1
Yr
2
Yrs
3
Yrs
4
Yrs
5
Yrs
Casing / Panels
and Frames
Visual check for
damage, rust and dust
accumulation.
For highly corrosive environment,
wash panels quarterly with water
and neutral detergent solution. Wax
panels. Repair / re-paint where
required.
Insulation
Visual check for
insulation conditions.
Repair / replace insulation material.
Fan
Visual check for run
out of balance and dust
attached
Clean off dust as necessary to
negate possibility of fan running out
of balance
Motor
Ω
Visual check on wiring.
Insulation resistance
check to be carried out
annually
Measure insulation resistance to
earth with Megger.
Insulation resistance should be more
than 1MΩ.
Heat
Exchanger
Check for clogging by
dust. Check for leaks /
damage.
Clean air inlet side as necessary.
Straighten any bent fins using fins
comb.
Drain Pan/
Condensation line
Check for obstructions
and free flow of water
Clean to eliminate obstructions/
sludge and check condition of pan.
Pour water to ensure flow
Filter *
Check for clogging
by dust.
Clean Filter
Temperature
Readings
Measure air on
and air off
Place temperature probe in return
and supply air of unit.
Damper Motors
(If fitted)
Visual inspection of
motors open/closing.
Ensure no obstructions
Drive motors opened and closed.
Ensure correct operation
*
Service period for filter cleaning may vary depending on operating time and surrounding environment.
Содержание ERQ2-14AS
Страница 17: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 18: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 19: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...