UP163F RECUMBENT CYCLE (FOOTING)

2

1

3

4

2

5

1

CM

0

INCH

0

10

9

6

11

14

8

15

7

12

13

4

3

6

5

08/29/13

800.458.5872

www.ultraplay.com

UP163I RECUMBENT CYCLE (IN GROUND)

UP163S RECUMBENT CYCLE (SURFACE)

 
 

3/4" ANCHOR BOLT

(800001)

 
 

3/4" HEX NUT

(804058)

 
 

3/4" FLATWASHER

(2" O.D.) (817420)

 
 

3/4" FLATWASHER

(2" O.D.) (817420)

 
 

3/4" LOCKWASHER

(817354)

 
 

3/4" HEX NUT

(804058)

FOOTING ASSEMBLY DETAIL

UP163F (FOOTING)

UP163F (FOOTING)

24"

24"

3/4" HEX NUT

(804058)

3/4" LOCKWASHER

(817354)

3/4" FLATWASHER (2" O.D)

(817420)

BASE PLATE

CONCRETE (CURE 7

DAYS MIN.)

EARTH

FOOTING DETAIL

CONCRETE REQUIRED:

.23 CUBIC YARDS

.18 CUBIC METERS

NOTE:
-SLOPED FOOTING IS A REQUIREMENT
OF EUROPEAN STANDARD EN1176-1
ONLY.
-SUGGESTED MINIMUM CONCRETE
RATING 3000 PSI

3/4" ANCHOR BOLT

(800001)

3/4" FLATWASHER (2" O.D.)

(817420)

3/4" HEX NUT

(804058)

Содержание FitTech UP163F

Страница 1: ...NT CYCLE IN GROUND UP163S RECUMBENT CYCLE SURFACE Items listed below Hardware Complete line are included with Hardware Complete Number Warning During Installation Hardware And Small Parts Are Choking Hazards For Young Children Store Unused Parts Appropriately Until Assembly Is Completed Once Assembly Is Completed Remove Any Unused Parts From The Play Environment And Dispose Save Them In A Secure L...

Страница 2: ...frame shall be an all welded assembly fabricated from SPP carbon steel pipe and dual phase steel plate The frame shall be powder coated PEDAL The Saddle shall be constructed from aluminum and Electro deposition coated POST CAP The Post Cap shall be constructed from injection molded Polyethylene SADDLE The Saddle shall be constructed from injection molded Nylon W6 HARDWARE All nuts bolts screws and...

Страница 3: ...nd set for a minimum of 7 Days attach Recumbent Cycle to 3 4 Anchor Bolt using 3 4 Flat Washer 2 O D 3 4 Lock Washer and 3 4 Hex Nut See Footing Assembly Detail 4 Attach Base Cover to Equipment Post using Base Cover Nut and Base Cover Bolt included with Base Cover See Base Cover Detail INSTALLATION INSTRUCTIONS FOR UP163I IN GROUND 1 Dig holes or drill holes according to Plan View and Elevation Vi...

Страница 4: ... wear and immediately put equipment out of service until any faulty parts found are repaired or replaced Also Check all metal parts for rust paint loss and touch up if necessary with paint Check for welded areas and verify integrity Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury infection or disease Maintain detailed installatio...

Страница 5: ...itoutdoors com 5 ActionFit UP163I RECUMBENT CYCLE IN GROUND UP163S RECUMBENT CYCLE SURFACE ELEVATION VIEW PLAN VIEW UP163F FOOTING UP163F FOOTING 10 9 16 in 26 83 cm 21 1 8 in 53 66 cm 24 in 60 96 cm 24 in 60 96 cm 7 13 16 in 19 82 cm 24 in 60 96 cm 39 9 16 in 100 57 cm 24 in 60 96 cm 90 ...

Страница 6: ...3I RECUMBENT CYCLE IN GROUND UP163S RECUMBENT CYCLE SURFACE UP163I IN GROUND UP163I IN GROUND 10 9 16 in 26 83 cm 21 1 8 in 53 66 cm ELEVATION VIEW 40 1 8 in 101 92 cm 90 8 5 16 in 21 17 cm 24 in 60 96 cm 24 in 60 96 cm INGROUND MOUNT MUST HAVE 3 OF SURFACING PLAN VIEW 24 in 60 96 cm 24 in 60 96 cm BRICK OR EQUIVALENT ...

Страница 7: ...w actionfitoutdoors com 7 ActionFit UP163I RECUMBENT CYCLE IN GROUND UP163S RECUMBENT CYCLE SURFACE ELEVATION VIEW PLAN VIEW UP163S SURFACE UP163S SURFACE 39 9 16 in 100 57 cm 90 7 13 16 in 19 82 cm EXISTING CONCRETE MUST BE 4 MINIMUM DEPTH 10 9 16 in 26 83 cm 21 1 8 in 53 66 cm ...

Страница 8: ...4 FLATWASHER 2 O D 817420 3 4 LOCKWASHER 817354 3 4 HEX NUT 804058 FOOTING ASSEMBLY DETAIL UP163F FOOTING UP163F FOOTING 24 24 3 4 HEX NUT 804058 3 4 LOCKWASHER 817354 3 4 FLATWASHER 2 O D 817420 BASE PLATE CONCRETE CURE 7 DAYS MIN EARTH FOOTING DETAIL CONCRETE REQUIRED 23 CUBIC YARDS 18 CUBIC METERS NOTE SLOPED FOOTING IS A REQUIREMENT OF EUROPEAN STANDARD EN1176 1 ONLY SUGGESTED MINIMUM CONCRETE...

Страница 9: ...NT 1 2 ANCHOR ROD 135038 CONCRETE REQUIRED 30 CUBIC YARDS 23 CUBIC METERS NOTE SLOPED FOOTING IS A REQUIREMENT OF EUROPEAN STANDARD EN1176 1 ONLY SUGGESTED MINIMUM CONCRETE RATING 3000 PSI IN GROUND ASSEMBLY DETAIL UP163I IN GROUND 24 60 96 cm 3 4 x 2 HEX HEAD CAP SCREW 801533 3 4 FLATWASHER 2 O D 817420 3 4 LOCKWASHER 817354 3 4 HEX NUT 804058 IN GROUND DETAIL UP163I IN GROUND BASE PLATE 3 4 FLAT...

Страница 10: ...ITH WIRE MESH REINFORCEMENT MINIMUM 7 DAYS CURE FULL CURE AFTER 28 DAYS BASE PLATE WIRE MESH SUBSTANTIAL COMPACT SUBGRADE WEDGE ANCHOR 206358 3 4 LOCKWASHER 817354 SURFACE DETAIL DRILL 3 4 x 2 1 2 HOLE IN CONCRETE TO RECEIVE WEDGE ANCHORS 3 4 WEDGE ANCHOR 206358 3 4 FLATWASHER 2 O D 817420 3 4 HEX NUT 804058 3 4 LOCKWASHER 817354 SURFACE ASSEMBLY DETAIL UP163S SURFACE USE BASE PLATE AS A GUIDE FOR...

Страница 11: ...M 0 INCH 0 10 9 6 11 14 8 15 7 12 13 4 3 6 5 08 29 13 800 458 5872 www ultraplay com UP163I RECUMBENT CYCLE IN GROUND UP163S RECUMBENT CYCLE SURFACE BASE COVER NUT BASE COVER BOLT BASE COVER NUT BASE COVER BOLT BASE COVER BASE COVER EQUIPMENT POST BASE COVER DETAIL ...

Отзывы: