www.acti.com
Hardware Manual
24
Step 8: Close the Dome Cover
1.
Align the cable hole side of the dome cover to the direction of the network cable.
2.
Tighten the three (3) screws using the supplied hex screwdriver to attach the dome cover.
3.
Remove the thin film.
Final installation should look similar to the illustration below.
NOTE:
The photographed model in this section is for demonstration only. The instruction
applies to all models listed in this manual.
Содержание E924
Страница 10: ...www acti com Hardware Manual 10 Physical Description E924 E926 E928 E933 E925 E927 E929 4 4 4 4 4 5 5...
Страница 12: ...www acti com Hardware Manual 12 E924M E926M E928M E933M E925M E927M E929M 4 4 4 4 4 5 4...
Страница 33: ...www acti com Hardware Manual 33 10 Close the dome cover...