
C65 ICB 40A/2P
AITR8000
AIM-M10
C65H ICB 16A/2P
AKH-0.66P26
C65N C16/2P
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
ATSE
BG3-63II/N4DR
Interpact
INS 63A
PZ300
AKH-0.66Z
80/0.05
AID10
DC 24V
RS485
C65H ICB 16A/2P
C65H ICB 16A/2P
C65H ICB 16A/2P
C65H ICB 20A/2P
C65H ICB 16A/2P
C65H ICB 16A/2P
C65H ICB 16A/2P
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
C65N-C16/2P+Vigi C65 ELM 32A/2P 30mA
C65N-C20/4P+Vigi C65 ELM 32A/4P 30mA
6A
WX1
WX2
WX3
WX4
WX5
WX6
WX7
WX8
C65 ICB
40A/2P
WL1
WL2
WL3
WL4
WL5
WL6
WL7
WL8
SPD
WL9
AC220V/AC220V 8kVA
Medical isolation transformer
Lo
ad
In
su
l
Te
mp
Alarm and display instrument
(Installed in operating room)
Wall socket1 (special for surgery)
Wall socket2 (special for surgery)
Wall socket3 (special for surgery)
Wall socket4 (special for surgery)
Tower crane
Central Intelligence Control Panel
Operating Bed
PC Platform
Emergency lamp
Viewing lamp
Writing table lamp
Operation table
OR1 lighting
Three-phase socket ( reserve)
OR2 lighting
Electric door power supply
Operating room shadowless lamp
MED-IMD
Note: The grounding bat in the isolated power supply cabinet should be connected reliably with the
equipotential terminals in the field.
9 Power on and debugging instructions
9.1 Wiring check
For each set of IT system, the wiring check should be conducted before power on, mainly checking
whether there is wrong, missed or short connection. The examination can be conducted sequentially
in the following order according to the wiring diagrams shown in section 5.4 of this manual:
1) Check whether each four-piece set constitutes an independent IT distribution system, and ensure
that the current, resistance and temperature signals monitored by each insulation monitor are
connected to the same isolation transformer and its IT system.
2) Check the AIM-M10 DC power output. Whether the 5 and 6 (+ 24 V, G) of the 24V output end are
respectively reliably connected with the 24 V and G terminals of the AID series external display
device, and the positive and negative poles are correct.
3) Check whether the No.15 (I0) and 16(I1) terminals of AIM-M10 in each system are reliably connected
to the terminals of the transformer AKH-0.66P26 socketed to the secondary side of the corresponding
isolation transformer, and are not grounded. The transformer only passes one of the two lines of
the output terminals of the isolation transformer.