5.3.2 Installation mode of AID series alarm and display instrument
1)If AID10 is embedded into the wall, the standard 86*86 mounting hole shall be reserved in advance.
The installation diagram is as follows:
3)Fix AID10 rear cover
assembly with 86 boxes
M4 Screw
4)Connect AID10 upper shell
assembly with lower shell
assembly (note pin alignment
with socket)
5)Installation is complete
Note: Due to the continuous
updating of our products, this
drawing is for reference only
until it has been confirmed by
the relevant personnel.
Upper shell
assembly
Run
Overload
Insulation
OverTEMP
Test
AID10
Mute
86 boxes
and walls
86 boxes
and walls
86 boxes
and walls
Lower shell
assembly
2)Connect the connecting wire
to the AID10 rear cover
assembly through the terminal
AID10 shape
1)Separate the upper
and lower shell of
AID10 with a screwdriver
2)If AID10 is installed by opening the cabinet door, the installation diagram is as follows:
1.Separate the upper shell
from the lower shell with a
slotted screwdriver
2.Door panel hole size
3.Fix the lower shell
and door panel with
M4 screws
4.Connect the upper shell
and the lower shell
Cabinet
运行
过载
绝缘
超温
消音 自检
AID10
5.Installation is complete
AID10 shape
5.3.3 Installation mode of AID150
1) If you choose to embed the wall for installation, the installation diagram is as follows: