background image

8

air Filter requirements

 Warning:

never operate the unit without a filter in place. 

Dust and lint could accumulate on internal parts, 

resulting in loss of efficiency, equipment damage 

and possible fire. replace disposable filters with 

the same type and size.

•  Air filter(s) are not supplied and must be installed in the 

return air system by the installer.Only three phase units 

are equipped with an internal filter rack assembly.

•  All return air must pass through the filters before entering 

the unit. Recommended filter sizes are listed in 

Table 1

notE:

 It is important that all filters be kept clean and 

replaced frequently to ensure proper operation of unit. 

Dirty or clogged filters will reduce the efficiency of the 

unit and result in unit shutdowns.

•  Air filter pressure drop must not exceed 0.08 inches 

WC. When replacing the air filters, a suitable air filter 

must be installed upstream of the evaporator coil of the 

return air system.

•  Downflow Installations require an internal filter accessory 

kit to be installed.

•  Horizontal Installations require the air filter system be 

installed in the return air ductwork.

unit SizE

intErnal FiltEr SizE

Q6SE-X36

(1) 12” x 20” x 1”

and

(2) 10” x 25” x 2”

Q6SE-X48 / X60

(1) 12” x 20” x 1”

and

(2) 12” x 25” x 2”

table 1. internal Filter Sizes

HEat PumP inStallation

Packaging removal

Remove the shipping carton and User’s Manual from 

the equipment. Take care not to damage the tubing 

connections when removing the carton. For rooftop 

installations, remove and discard the two supports attached 

beneath the unit.

rigging & Hoisting

 Warning:

to avoid the risk of property damage, personal 

injury, or death, it is the rigger’s responsibility 

to ensure that whatever means are used to hoist 

the unit are safe and adequate:

• 

the lifting equipment must be adequate for the 

load. refer to 

table 5 (page 15)

 for unit weights.

• 

the unit must be lifted from the holes in the 

base rails using cables or chains.

• 

Spreader bars are required to protect the unit 

and ensure even loading.

•  Keep the unit in an upright position at all times. 

the rigging must be located outside the units 

center of gravity. refer to 

Figure 7 (page 15)

 

for locating the center of gravity.

•  All  panels  must  be  securely  in  place  during 

rigging and hoisting.

minimum clearance requirements

Q6SE units are certified as combination heating and 
cooling equipment for outdoor installation only. 

Figure 

2 (page 7)

 displays the minimum clearances to 

obstructions for both downflow and horizontal discharge.

Units may be installed on wood flooring or on Class A, B, 

or C roof covering material when used with bottom supply 

and return air ducts as long as the following requirements 

are met:

•  If  using  horizontal  supply  and  return  air  ducts,  the 

horizontal roof curb kit and return air kit must be installed 

prior to unit installation. Horizontal roof curb is required.

•  If using bottom discharge with return air ducts a roof 

curb must be installed prior to unit installation. See 

Rigging and Hoisting section for setting of the unit.

ground level

Ground level installations must be located according to 

local building codes or ordinances and these requirements:

•  Clearances must be in accordance with those shown 

in 

Figure 2

. Also consider clearances for access to the 

internal filter.

•  A suitable mounting pad must be provided and separate 

from the building foundation. The pad must be level to 

ensure proper condensate disposal and strong enough 

to support the unit’s weight. The slab height must be a 

minimum of 2” (5cm) above grade and with adequate 
drainage. See 

Figure 3

.

2”

Figure 3. ground level installation

Содержание Q6SE X36

Страница 1: ... plays an important role as well Pay attention to all safety warnings and any other special notes highlighted in the manual Improper installation of the furnace or failure to follow safety warnings could result in serious injury death or property damage Theseinstructionsareprimarilyintendedtoassistqualifiedindividualsexperiencedintheproper installation of this appliance Some local codes require li...

Страница 2: ...2 ...

Страница 3: ... the Heat Pump for Automatic Cooling Heating 5 Operating the Indoor Blower Continuously 5 Shutting the Heat Pump Off 5 HEAT PUMP MAINTENANCE 5 Regular Cleaning 5 TROUBLESHOOTING 5 Warranty Information 5 START UP adjustments 13 Pre Start Check List 13 Start Up Procedure 13 Air Circulation 13 Short Cycle Protection 13 System Cooling 13 System Heating 13 Refrigerant Charging 13 Charging an R 410A Uni...

Страница 4: ...hange the fan mode to AUTO See Figure 1 2 Setthetemperatureselectortothedesiredtemperature level Theoutdoorfan compressor andblowermotorwill all cycle on and off to maintain the indoor temperature at the desired cooling level NOTE If the temperature level is re adjusted or the system mode is reset the fan and compressor in the outdoor unit may not start immediately A protective timer circuit holds...

Страница 5: ... service on the system Failure to comply may result in personal injury or death Proper maintenance is most important to achieve the best performancefromtheapplianceandshouldbeperformed by a qualified service technician at least once a year Follow the maintenance schedule and the instructions below for years of safe trouble free operation Regular Cleaning Clean or replace the indoor air filter at t...

Страница 6: ...authorized parts or accessory kits may be used with this product Improper installation service adjustment ormaintenance may cause explosion fire electrical shock or other hazardous conditions which may result in personal injury or property damage WARNING The safety information listed below must be followed during the installation service and operation of this unit Unqualified individuals shouldnot...

Страница 7: ... calculatedandasystemofthepropercapacityselected It is recommended that the area to be conditioned be completely insulated and vapor sealed Check the electrical supply and verify the power supply is adequate for unit operation If there is any question concerning the power supply contact the local power company Allunitsaresecurelypackedatthetimeofshipmentand upon arrival should be carefully inspect...

Страница 8: ...ans are used to hoist the unit are safe and adequate The lifting equipment must be adequate for the load Refer to Table 5 page 15 for unit weights The unit must be lifted from the holes in the base rails using cables or chains Spreader bars are required to protect the unit and ensure even loading Keep the unit in an upright position at all times The rigging must be located outside the units center...

Страница 9: ...ccess panel was designed to fit underneath the top panel 2 Slide the first filter between both guide channels of filter rack and allow the filter to drop easily into place 3 Verify the bottom of the filter is within the channels of the rack 4 Slide the 2nd filter and 3rd filter on taller models between both guide channels of filter rack 5 Verify the top of the filter is within the channels of the ...

Страница 10: ...ct it to the terminal marked 208V Optional equipment requiring connection to the power or control circuits must be wired in strict accordance of the NEC ANSI NFPA 70 applicable local codes and the instructions provided with the equipment ELECTRICAL WIRING WARNING To avoid risk of electrical shock personal injury ordeath disconnectallelectricalpowertotheunit before performing any maintenance or ser...

Страница 11: ...ermostat connections are listed in Table 3 page 12 The thermostat should be mounted about 5 feet above theflooronaninsidewall DONOTinstallthethermostat on an outside wall or any other location where its operationmaybeadverselyaffectedbyradiantheatfrom fireplaces sunlight or lighting fixtures and convective heat from warm air registers or electrical appliances Refer to the thermostat s instruction ...

Страница 12: ...y 6 hours and 4 minutes unless the coil temperature is above the selected terminate temperature Thesystemcanbemanuallyforcedintodefrostmodeat any time by shorting the TEST terminals on the demand defrost board together for more than 9 seconds The coil temperature sensor does not need to be cold when the unit is forced into defrost After the TEST input is removed thedefrostmodewillterminatein13 7mi...

Страница 13: ...nit are free from obstructions and debris and all equipment access control panels are in place Verifythattheductworkissealedtopreventairleakage Verify that the line voltage power leads are securely connected and the unit is properly grounded Verify that the low voltage wires are securely connected to the correct leads on the low voltage terminal strip Verify that the outdoor fan turns freely Verif...

Страница 14: ...structed with sheet metal WARNING Do not place combustible material on or against the unit cabinet Do not place combustible materials including gasoline and any other flammable vapors and liquids in the vicinity of the unit CAUTION The unit should never be operated without a filterinthereturnairsystem Replacedisposable filters with the same type and size Proper maintenance is important to achieve ...

Страница 15: ... 24 9 13 5 16 12 13 3 13 5 16 12 CG A 47 5 75 NPT Female Drain Connector B DOWNFLOW SUPPLY DUCT OPENING DOWNFLOW RETURN DUCT OPENING 23 5 Back View 13 5 16 0 13 7 13 5 16 0 12 45 11 75 22 75 55 8 C HORIZONTAL SUPPLY DUCT OPENING HORIZONTAL RETURN DUCT OPENING 4 0 CONDENSING COIL 5 0 8 4 00 Side View 1 1 4 Ø Power Entry 1 3 4 Ø Power Entry Capped 22 25 Ø Control Wiring Entry 23 3 5 27 1 5 30 1 4 5 ...

Страница 16: ...FROST BOARD Typical Wiring for Two Stage Heat Pump Cool Operation Economizer HP Cool E R W1 O Y2 C G A1 Y1 UNIT LOW VOLTAGE TERMINAL BOARD Y2 E R W2 IN O Y C M 1 2 3 4 5 6 7 8 9 Brown ACCESSORY HEAT PLUG 1 2 3 4 5 6 7 8 9 ECONOMIZER PLUG IF APPLICABLE SEE ECONOMIZER INSTALLATION INSTRUCTIONS Blower Relay See Note L W2 OUT W2 FACTORY WIRING FIELD WIRING NOTE If installing an economizer using the ne...

Страница 17: ...DEFROST BOARD ACCESSORY HEAT PLUG E R W1 O Y2 C G A1 Y1 UNIT LOW VOLTAGE TERMINAL BOARD Y2 M E R W2 IN O Y C Typical Wiring for Two Stage Heat Pump Cool Operation Economizer HP Cool 1 2 3 4 5 6 7 8 9 ECONOMIZER PLUG IF APPLICABLE SEE ECONOMIZER INSTALLATION INSTRUCTIONS See Note Blower Relay See Note W2 OUT L W2 FACTORY WIRING FIELD WIRING NOTE If installing an economizer using the new Honeywell W...

Страница 18: ...TIME IS ACCUMLATED OPENING OF DFT DURING DEFROST OR INTERVAL PERIOD RESETS THE INTERVAL TO 0 NOTE See Installation Instructions for wiring application and Information concerning accessory Heat Kits and other options WIRING DIAGRAM 10160710 1 2 3 4 5 6 7 8 9 9 8 1 7 6 5 4 3 2 9 8 1 7 6 5 4 3 2 T2 T1 T3 R C S T2 T1 N G L C T3 T4 T5 TO 208 230 VAC POWER SUPPLY 9 8 1 7 6 5 4 3 2 9 8 1 7 6 5 4 3 2 3 PH...

Страница 19: ...CK YELLOW YELLOW BLACK GREEN RED BROWN WHITE BLUE BLACK WHITE YELLOW GREY ORANGE BROWN YELLOW BLACK RED RED BROWN BLACK RED RED YELLOW GREEN BLACK BLACK 460 Volt Convertible Packaged Heat Pump Three Phase 60Hz WIRING DIAGRAM NOTES 1 Disconnect all power before servicing 2 For supply connections use copper conductors only 3 If any of the original wire as supplied with the furnace must be replaced i...

Страница 20: ...when above curve Add refrigerant when below curve Figure 12 Charging Chart for 3 Ton Units Q6SE X48 Charging Chart Cooling 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 600 75 80 85 90 95 100 105 110 115 120 125 130 135 Liquid Pressure psig Liquid Temperature F Remove refrigerant when above curve Add refrigerant when below curve Figure 13 Charging Chart for 4 Ton ...

Страница 21: ...1 20 01 1358 20 94 1279 22 23 X48 Tap T1 952 29 87 901 31 56 864 32 91 728 39 06 672 42 31 583 48 77 508 55 97 Tap T2 1646 17 27 1593 17 85 1520 18 71 1476 19 26 1417 20 07 1349 21 08 1265 22 48 1198 23 73 Tap T3 1764 16 12 1705 16 68 1626 17 49 1570 18 11 1525 18 65 1451 19 60 1403 20 27 1304 21 81 Tap T4 1962 14 49 1916 14 84 1838 15 47 1787 15 91 1720 16 53 1670 17 03 1595 17 83 1537 18 50 Tap ...

Страница 22: ...22 ...

Страница 23: ...23 ...

Страница 24: ...uct Safety should always be the deciding factor when installing this product and using common sense plays an important role as well Pay attention to all safety warnings and anyotherspecialnoteshighlightedinthemanual Improperinstallationof the unit or failure to follow safety warnings could result in serious injury death or property damage These instructions are primarily intended to assist qualifi...

Отзывы: