27
Illustration
Component
Test
Results
Thermal Cutout
Disconnect all wires from TCO.
Measure resistance across terminals.
Cavity Thermal Fuse ......................................
Magnetron TCO ..............................................
Open at 219° F (104° C).
Open at 280° F (138° C) and
closed at 180° F (82° C).
Diode Assembly
Discharge Capacitors
Remove diode lead from capacitor and
connect ohmmeter.
Reverse leads for second test.
Infinite resistance should be measured
in one direction and 50K
or more in
the opposite direction.
NOTE:
Test meter must contain a
battery of 6 volts minimum.
MT2
MT1
GA TE
Triac
Disconnect wires to triac.
Measure resistance from:
MT1 to MT2 ....................................................
MT1 to Gate....................................................
MT2 to Gate....................................................
All terminals to ground....................................
Caution - Do not operate oven with
wire to terminal MT2 removed.
Infinite.
Approximately 40
or more.
Infinite.
Infinite.
Capacitor
Discharge Capacitors
Remove wires from capacitor terminals and
connect ohmmeter, set on highest
resistance scale to terminals.
Also check between each terminal and
capacitor case.
Between Terminals:
Meter should
momentarily deflect towards zero then
return to over 5 M
. If no deflection
occurs, or if continuous deflection
occurs, replace capacitor.
Terminal to Case:
Infinite resistance.
Snubber Assembly
Disconnect wires to snubber.
Measure resistance across terminals.............
Infinite.
Magnetron
Discharge Capacitors
Remove wires from magnetron and
connect ohmmeter to terminals. Also check
between each terminal and ground.
Between Terminals:
Less than 1
.
Each terminal to ground measures
Infinite resistance.
NOTE:
This test is not conclusive. If
oven does not heat and all other
components test good replace the
magnetron and retest.
Stirrer Motor
Remove all wires from terminals.
Measure resistance from:
Terminal to terminal ....................................
Approximately 25 K
.
Blower Motor
Remove all wires from motor.
Measure resistance across coil (OR- WH).....
Approximately 30
.
!
WARNING
To avoid risk of electrical shock, personal injury or death, disconnect power to oven and discharge capacitor
before servicing, unless testing requires power.
Output drive voltage to triac
Triac terminals.............................................
Gate—T1 ...................................................
0 VAC (Idle and Standby)
0.9 VAC (Cook)
.
Component Testing Procedures
Содержание Menumaster DEC21E2
Страница 1: ...Service Training Manual Compact Models DEC 50 Hz CHDC 50Hz Chinese Oven September 2011 16400016 ...
Страница 3: ...1 Important Safety Information 1 ...
Страница 13: ...11 DEC 50 Hz Components 4 ...
Страница 18: ...16 Components Sample Door Assembly 5 6 7 8 7 9 7 7 6 6 7 6 ...
Страница 19: ...17 Disassembly Inner door window removal Switch replacement door adjustment 5 ...
Страница 26: ...24 Airflow 7 ...
Страница 27: ...25 Air filter must be in place and cleaned regularly Some Models ...
Страница 28: ...26 Component Testing Procedures 8 ...
Страница 34: ...32 Troubleshooting Intial Power Up Standby Condition Cook Condition 9 ...
Страница 38: ...36 Wiring Diagrams Schematics 10 ...
Страница 47: ...45 Notes ...
Страница 48: ...www acpsolutions com 01 23 45 6 7 7 8 94 7 1 8 1 ...