ACORN ENGINEERING FIELD SERVICE
TOLL FREE
800-743-8259 •
LOCAL
626-855-4866 •
FAX
626-855-4863
INSTALLATION, OPERATIONS & MAINTENANCE MANUAL
®
MERIDIAN 3753-LHL
Please visit
www.acorneng.com
for most current specifications.
Page 10 of 27
1/2" SPOUT HOSE
1/2" HOSE x
1/4" NPT
ADAPTER
1/4" NPT x 1/4" O.D.
TUBE ADAPTER
1/4" PE O.D. TUBING
NUT
WASHERS
NOTE: FITTINGS AND TUBE SHOULD BE KEPT
CLEAN, BAGGED AND UNDAMAGED PRIOR TO
INSTALLATION.
PUSH-IN FITTING INSTALLATION
3. Pull on the fitted tubing to ensure it is secure. Tube
should not come free from the fitting. Water test the
connection assembly prior to leaving the site to ensure
there are no leaks.
4. To disconnect the tube from the fitting ensure that the
water supply is off. Push collet square towards the
push-in fitting body and hold. While holding the collet in,
pull on the PE tubing to remove from the push-in fitting.
1. Cut to fit length of 1/4” PE tubing and remove any burrs
or sharp edges. Ensure that the outside diameter is free
from score marks. Tube ends should be square.
2. Firmly and fully insert the tubing end into the push-in
fitting up to the tube stop located approximately 1/2”
deep.
1.
2.
3.
4.
1. Assemble spout to deck securing it with nut.
3. Connect 1/4” O.D. PE tubing from valve.
SPOUT INSTALLATION
2. Assemble hose adapter to tube adapter and connect
to spout hose.
Part #: 6215-372-000
ADAPTER
TUBE STOP
1/4" PE TUBING
COLLET
HOSE
COLLET
Revised: 03/05/19