Acorn Safety S1360-HT Скачать руководство пользователя страница 9

Page 9 of 11

 

Revised: 11/12/18

Installation & Operation Manual

Manual #7109-208-001

1. Check for obvious signs of wear, broken or defective 

equipment. Re-paint if necessary. Replace missing or 
defective equipment such as broken push paddles, 
missing signs and inspection tags. 

2. Lower both eyes into flow. Both eyes should be flushed 

to prevent contamination from one eye from being 
delivered to unaffected eye. Personnel who wear contact 
lenses should remove them immediately prior to or 
during the flush to prevent the contamination from 
remaining against the cornea possibly causing 
unnecessary damage or pain.

4. When finished return the push paddle to the vertical or 

fully “OFF” position and return spray nozzle assembly to 
standby position. Flushing fluid should stop. Once 
flushing fluid has stopped flowing, return spray nozzle 
lids to the closed position to protect from airborne 
contaminates.

EYE/FACE WASH OPERATION 

INSTRUCTIONS:

Maintain and inspect in accordance with ANSI Z358.1-2009

Employees who work with hazardous materials should 
become familiar with the location and operation of the 
nearest emergency plumbing fixture. Emergency plumbing 
fixtures stations are simple to use and require hands free 
operation once the station is activated. Regular instruction 
regarding proper care and use will increase confidence that 
the units are accessible and function properly.

EYE/FACE WASH MAINTENANCE 

GUIDE:

2. Remove strainer and washout any debris collected 

–replace as required.

The route and area surrounding the Eye Wash should be 
clear and unobstructed; the sooner eyes are flushed, the 
less likelihood of damage. Eye Wash stations should be 
located in close proximity to the hazard and take no more 
than 10 seconds to reach. In the case of sever eye 
contamination the victim may require assistance to the Eye 
Wash station and help flushing their eyes.
Safety plumbing fixture equipment should be operated 
weekly for a period long enough to verify operation, clear 
the supply line of any sediment build-up and minimize 
microbial contamination due to sitting water.
1. To start the Eye Wash, swing spray nozzle assembly over 

the basin and push the paddle forward to the horizontal 
or fully “ON” position. Flushing should start, popping the 
spray nozzle caps open.

3. Using thumb and forefingers, fully open eyelids and flush 

eyes thoroughly for approximately 15 minutes or until 
medical personnel arrive. Be prepared to let the doctor 
know what type of contamination has entered the eye. 

 

Acorn Safety

 

a division of Acorn Engineering Company™

5. Return push paddle to vertical or fully “OFF” position and 

swing back to stand by position. To prevent Eye Wash 
spray nozzles from becoming contaminated, always 
close nozzle lids after each use. 

4. While in operation, inspect spray nozzles for clogs or 

debris correct or replace as required.

3. Operate Eye Wash nozzles using the push paddle to 

place ball valve in the fully “ON” position checking for 
smooth operation of valve push paddle mechanism at the 
same time ensuring that the Eye Wash spray nozzle caps 
pop off immediately when actuated. If the ball valve does 
not operate smoothly check the actuating assembly for 
binding or missing parts. If the Eye Wash spray nozzle 
caps do not pop off immediately when actuated check for 
correct supply inlet pressure.

Содержание S1360-HT

Страница 1: ...ued with each unit and disregard or non compliance with these instructions will constitute an abnormal use condition and void the warranty Stainless steel must be protected on job sites during constru...

Страница 2: ...ve unwanted debris from the lines and prevent unwanted blockages in the safety equipment 5 All employees at risk of contamination should be informed and trained in the use of this and any other safety...

Страница 3: ...n Safety a division of Acorn Engineering Company Installation Operation Manual SHOWER SPRAY PATTERN 20 508 SPRAY PATTERN 34 435 8 32 821 CLEAR ZONE GENERAL NOTES 1 ALL DIIMENSIONS ARE IN INCHES MM 2 A...

Страница 4: ...d Combination Station Eye Face Wash Plastic Showerhead Drench Hose S1360 HT 84 7 16 645 8 42 235 8 883 8 93 4 8 FREEZE PROTECTION VALVE INSTALL OPPOSITE SUPPLY 1 1 4 NPT OPTIONAL SUPPLY LOCATION GENER...

Страница 5: ...ns STEP TWO SUPPLY AND SANITARY DRAIN CONNECTION 2 Make sure proper drainage is supplied nearby 1 Install necessary pipe fittings supplied by others to make connection to 1 NPT supply union w potable...

Страница 6: ...rn Engineering Company Installation Operation Manual DETAIL VIEW EXPLODED VIEW FPV CABLE TIES OR FIBERGLASS TAPE BY OTHERS 1 2 NPT X 1 2 ID TUBE BARBED 1 2 14 ANTI FREEZE VALVE 1 2 14 X 1 1 2 L Galv N...

Страница 7: ...OPEN AND BLEED WATER UNTIL THE VALVE TEMPERATURE INCREASES THIS CAN BE REMEDIED BY SUPPLYING TEMPERED WATER TO THIS UNIT MAKE SURE THAT HEAT TRACE CABLE HAS HAD TIME TO WARM UP BEFORE TESTING WITH COL...

Страница 8: ...The route and area surrounding the Drench Shower should be clear and unobstructed the sooner a person has rinsed off any contamination the less likelihood of injury Drench Shower stations should be lo...

Страница 9: ...obstructed the sooner eyes are flushed the less likelihood of damage Eye Wash stations should be located in close proximity to the hazard and take no more than 10 seconds to reach In the case of sever...

Страница 10: ...ation Operation Manual Manual 7109 208 001 Revised 11 12 18 Page 10 of 11 Acorn Safety a division of Acorn Engineering Company 1 2 3 4 5 6 7 8 9 10 29 28 27 26 23 22 21 9 20 19 18 17 16 15 14 13 12 25...

Страница 11: ...008 000 3 8 16 ZINC PLATED NUT 14 7100 400 000 PUSH HANDLE LABEL 15 7106 407 199 ACTIVATOR PUSH HANDLE HT TRACE 16 7100 325 000 S S 1 1 4 x1 2 NPT REDUCING BUSHING 17 1974 001 000 1 2 14x1 5 L GALV NP...

Отзывы: