Acorn Safety S1360-HT Скачать руководство пользователя страница 7

NOTE: 

STEP FOUR: TESTING

Note: A GFCI protected circuit providing single phase 120 

VAC, 60 Hz electrical service is required. Fixture is rated 
5A @ 0° Fahrenheit ambient temperature. Refer to the 
Wiring Diagram for electrical box connections. 

1. Install sign “B” with clear visibility as shown, with 

appropriate hardware (supplied by others).

2. Attach inspection tag, “C”, supplied with plastic zip tie to 

the activation handle.

IF SUPPLY WATER TEMPERATURE IS BELOW 45° F (7° 
C), THE FREEZE PROTECTION VALVE MAY NOT 
REMAIN OPEN AND BLEED WATER UNTIL THE VALVE 
TEMPERATURE INCREASES. THIS CAN BE REMEDIED 
BY SUPPLYING TEMPERED WATER TO THIS UNIT. 
MAKE SURE THAT HEAT TRACE CABLE HAS HAD TIME 
TO WARM UP BEFORE TESTING WITH COLD (<50° F) 
SUPPLY WATER.

STEP THREE: ELECTRICAL CONNECTION

STEP FIVE: SIGNAGE AND INSPECTION

1. Open water supply.
2. Test for leaks, proper operations and flow.

1. Make power connections to the ground, neutral & hot

within the electrical box.

 

Manual #7109-208-001

Page 7 of 11

Revised: 11/12/18

 

Acorn Safety

 

a division of Acorn Engineering Company™

Installation & Operation Manual

SCHEMATIC

HEAT TRACED

CABLE

THERMOSTAT

WIRE CAP

YELLOW & GREEN

GROUND WIRE

TUBE

EXISITING GROUND SCREW
IN JUNCTION BOX

GROUND

NEUTRAL

HOT

Содержание S1360-HT

Страница 1: ...ued with each unit and disregard or non compliance with these instructions will constitute an abnormal use condition and void the warranty Stainless steel must be protected on job sites during constru...

Страница 2: ...ve unwanted debris from the lines and prevent unwanted blockages in the safety equipment 5 All employees at risk of contamination should be informed and trained in the use of this and any other safety...

Страница 3: ...n Safety a division of Acorn Engineering Company Installation Operation Manual SHOWER SPRAY PATTERN 20 508 SPRAY PATTERN 34 435 8 32 821 CLEAR ZONE GENERAL NOTES 1 ALL DIIMENSIONS ARE IN INCHES MM 2 A...

Страница 4: ...d Combination Station Eye Face Wash Plastic Showerhead Drench Hose S1360 HT 84 7 16 645 8 42 235 8 883 8 93 4 8 FREEZE PROTECTION VALVE INSTALL OPPOSITE SUPPLY 1 1 4 NPT OPTIONAL SUPPLY LOCATION GENER...

Страница 5: ...ns STEP TWO SUPPLY AND SANITARY DRAIN CONNECTION 2 Make sure proper drainage is supplied nearby 1 Install necessary pipe fittings supplied by others to make connection to 1 NPT supply union w potable...

Страница 6: ...rn Engineering Company Installation Operation Manual DETAIL VIEW EXPLODED VIEW FPV CABLE TIES OR FIBERGLASS TAPE BY OTHERS 1 2 NPT X 1 2 ID TUBE BARBED 1 2 14 ANTI FREEZE VALVE 1 2 14 X 1 1 2 L Galv N...

Страница 7: ...OPEN AND BLEED WATER UNTIL THE VALVE TEMPERATURE INCREASES THIS CAN BE REMEDIED BY SUPPLYING TEMPERED WATER TO THIS UNIT MAKE SURE THAT HEAT TRACE CABLE HAS HAD TIME TO WARM UP BEFORE TESTING WITH COL...

Страница 8: ...The route and area surrounding the Drench Shower should be clear and unobstructed the sooner a person has rinsed off any contamination the less likelihood of injury Drench Shower stations should be lo...

Страница 9: ...obstructed the sooner eyes are flushed the less likelihood of damage Eye Wash stations should be located in close proximity to the hazard and take no more than 10 seconds to reach In the case of sever...

Страница 10: ...ation Operation Manual Manual 7109 208 001 Revised 11 12 18 Page 10 of 11 Acorn Safety a division of Acorn Engineering Company 1 2 3 4 5 6 7 8 9 10 29 28 27 26 23 22 21 9 20 19 18 17 16 15 14 13 12 25...

Страница 11: ...008 000 3 8 16 ZINC PLATED NUT 14 7100 400 000 PUSH HANDLE LABEL 15 7106 407 199 ACTIVATOR PUSH HANDLE HT TRACE 16 7100 325 000 S S 1 1 4 x1 2 NPT REDUCING BUSHING 17 1974 001 000 1 2 14x1 5 L GALV NP...

Отзывы: