4
Furthermore, it is necessary to ensure appropriate unit ventilation to protect it from overheating and for reliable and
continuous operation. This is the reason why the unit should not be put in a place or under conditions where it is not
possible to offer sufficient ventilation for the unit’s housing surfaces. Finally, it is not allowed to place or suspend objects
or materials on the unit to prevent heat accumulation or an interruption of the air circulation and to protect the unit’s
mounting from excessive loads.
All service cables should be laid to make sure that nobody steps on them, trips over them or can put heavy objects on
them to prevent the hazard of injury and damage to the unit. Make sure that there is a fixed location and/or stable
suspension.
The industrial protection class of your unit can be upgraded up to IP65. If you have chosen this optional upgrade, one of
the central elements of the IP65-sealing is the cover for the connector interface on the lower side of the unit. Connect all
the required cables to the unit and insert them into the rubber sealings (
blue
) delivered with the unit. Insert the sealings
into the cover. Finally, fix the cover to the unit’s housing like indicated on the drawings below (
orange
).
If you have chosen the remote control option for your unit you should ensure to keep the IR-receiver within the opera-
ting panel freely accessible.
Содержание OR-MD Series
Страница 23: ...www orpc com ...