background image

KW350-P1-D-S-RC
Quick Setup Guide

·

Appearance and Dimension

 

·

 

Installation Method

 

·

 

Terminals

 

·

 

Wiring Diagram

 

·

 

Settings Mode

 

·

 

Communication

 

·

 

Energy Pulse Output

 

·

 

Event Logging

 

·

 

2

Appearance and Dimension

Installation Method

Steps:

1. To install the meter on the rail insert the top of the rail into the groove on the 
back of the meter. Pull the metal clips back and slide the rail across the groove of 
the meter. 

Unit: mm

Front View

Side View

3

2. Use the metal clips to tighten the rail to complete installation.

3. Before mentioning this step, the steps needed to remove the seal/cover need to 

To attach seal/cover back onto the meter place the left side of the cover down onto 
meter and press down on the right side. When installed correctly you will hear a 
clicking sound. The steps to attach the other cover is opposite to the above step.

4. After inserting the cover, tighten the sealing screws and lay the seal.

Pulse Output
Isolation Voltage

2500Vac

Load Voltage

0~250Vac

Load Current

100mA(max)

Relay Output
Load Voltage

250Vac 30Vdc

Max Load Current 

5A(Resistant Load)

Isolation Voltage

2000Vac(1min)

Action Time

10ms

Mechanical Life

20 million times

Electrical Life

About 50,000 times(5A, 250Vac,Resistant Load)

Communication
RS485 Baud Rate

1200~38400

Communication Protocol

ModBus-RTU

Infrared Communication

Non-contact infrared

Infrared Baud Rate

1200

Environment 
Working Temperature

-25~70°C

Storage Temperature

-40~85°C

Automation Components, Inc.

Phone: 1-888-967-5224

 

Web: www.workaci.com

Email: [email protected]
Document#2304E3201 Revision Date: Apr., 2021

4

Terminals

5. To open the cover, remove the seal if applicable, unscrew the sealing screws and 
life the cover upwards to remove.

5

Wiring Diagram

3 phase 4 wire (3LN, 3CT)

KW350

3 phase 3 wire (2LL, 3CT)

KW350

2305 Pleasant View Road, Middleton WI 

Отзывы: