
61
“Blue Edge” Trouble Shooting:
I. Re-adjust “Overfill” first.
For Overfill Re-adjustment:
i. Those 2 Adjustment Screws must be released for around 2 mm first.
ii. Alignment Sequence:
a.
To adjust “Horizontal Adjustment Screw” firstly, then “Vertical Adjustment
Screw”.
b.
Refer to below Figure.
II. Re-assemble LP module—include LP, LP Baffle, LP clip.
(2) Overfill Vertical
Adjustment Screw
(1) Overfill Horizontal
Adjustment Screw
Содержание X1130 Series
Страница 16: ...16 Product Overview ...
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 19: ...19 ...
Страница 39: ...39 Fig 1 3 Fig 1 4 1 Press down the Clip 2 Insert the LP Module Overfill adjustment screws LP Datum of DMD HSG ...
Страница 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Страница 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast ...
Страница 54: ...54 3 Blower wire alignment This clip must be screwed by this direction ...
Страница 58: ...58 11 Lamp Door screw assemble sequence First Second Third ...
Страница 62: ...62 Power Supply Problems Checking Flow ...
Страница 63: ...63 ...
Страница 65: ...65 Fan 1 Lamp Fan Fan 2 Power Fan Fan 3 Blower Fan Thermal sensor 2 Thermal sensor 1 LED message ...
Страница 76: ...76 ...
Страница 77: ...77 Module 2 ASSY UPPER CASE ...
Страница 78: ...78 Module 3 ASSY LOWER CASE ...
Страница 79: ...79 Module 4 ASSY FRONT CASE ...