45
(Fig. 6-1).
Fig. 6-1
7. Assembly OP ENG
7.1 Assemble “Baffle DMD” to “HSG DMD” (Fig.7-1).
7.2 Assemble Chip B/D Module to “HSG DMD” (Fig. 7-2).
Fig.7-1
Fig.7-2
7.3 Assemble Thermal Pad & Gasket Hest-sink then place contact DMD (Fig. 7-3).
(1) Pre-fastening Sequence: [ 1 ] - [ 2 ] - [ 3 ] - [ 4 ].
(2) Fastening Sequence: [ 4 ] - [ 3 ] - [ 2 ] - [ 1 ].
(3) Screw Torque must be confirmed to be 6 kg-cm.
Screw
Shield CW
BKT Link Lamp
Fixed shafts of
DMD HSG
Fixed holes of
ILL SUB HSG
Fixed holes of DMD
Fixed shafts of
DMD HSG
Содержание X1130 Series
Страница 16: ...16 Product Overview ...
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 19: ...19 ...
Страница 39: ...39 Fig 1 3 Fig 1 4 1 Press down the Clip 2 Insert the LP Module Overfill adjustment screws LP Datum of DMD HSG ...
Страница 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Страница 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast ...
Страница 54: ...54 3 Blower wire alignment This clip must be screwed by this direction ...
Страница 58: ...58 11 Lamp Door screw assemble sequence First Second Third ...
Страница 62: ...62 Power Supply Problems Checking Flow ...
Страница 63: ...63 ...
Страница 65: ...65 Fan 1 Lamp Fan Fan 2 Power Fan Fan 3 Blower Fan Thermal sensor 2 Thermal sensor 1 LED message ...
Страница 76: ...76 ...
Страница 77: ...77 Module 2 ASSY UPPER CASE ...
Страница 78: ...78 Module 3 ASSY LOWER CASE ...
Страница 79: ...79 Module 4 ASSY FRONT CASE ...