- 26 -
5
Tear down the two tape
behind the FFC and fix
the FFC of C/B to panel
The FFC must be
affixed besides the
under edge of the
panel
6
Assemble the SPK to the
main-SHD, the correct
position reference on the
picture, then the lock 4
screws to fasten it.
Screw-driver
7
Assemble the LVDS to the
I/F, the correct position
reference on the picture
Without the gap within
NOTE:
Circuit boards >10 cm² has been highlighted with the yellow rectangle as
above image shows. Please detach the Circuit boards and follow local regulations for
disposal.
8
Assemble the PCBA to
Main-SHD
Содержание G225HQ
Страница 22: ... 22 3 9 Packing ...
Страница 23: ... 23 4 Disassembly Assembly 4 1 Exploded View ...
Страница 24: ... 24 ...
Страница 46: ... 46 5 4 OSD Operation Guide ...
Страница 47: ... 47 ...
Страница 48: ... 48 ...
Страница 49: ... 49 ...
Страница 62: ... 62 Appendix 1 Screw List Torque A STANDARD SCREW TORQUE QCS ...
Страница 63: ... 63 ...
Страница 64: ... 64 B STANDARD SCREW TORQUE QZB QMX ...
Страница 65: ... 65 Appendix 2 Physical Dimension Front View and Side view Fig 1 Physical Dimension Front View and Side view ...
Страница 66: ... 66 ...
Страница 67: ... 67 Appendix 3 I F Board Please see the next page ...