- 38 -
5.2 Software / Firmware Upgrade Process
5.2.1 Hardware prepared:
Hardware Requirement:
1. ISP board x 1
2. DSUB VGA cables x 2
3. Printer cable (with one male connector and another female connector) x 1.
4. PC or Notebook with parallel (printer) port x1.
Connect to target monitor
VGA signal input from 15pin D-sub
cable of PC or NB.
Connect ISP board and PC
with printer port cable
Check the Jumpers on the
ISP Circuit Board (make sure
J5, J6, J7, J8 are set at ping
1,2 )
Содержание G225HQ
Страница 22: ... 22 3 9 Packing ...
Страница 23: ... 23 4 Disassembly Assembly 4 1 Exploded View ...
Страница 24: ... 24 ...
Страница 46: ... 46 5 4 OSD Operation Guide ...
Страница 47: ... 47 ...
Страница 48: ... 48 ...
Страница 49: ... 49 ...
Страница 62: ... 62 Appendix 1 Screw List Torque A STANDARD SCREW TORQUE QCS ...
Страница 63: ... 63 ...
Страница 64: ... 64 B STANDARD SCREW TORQUE QZB QMX ...
Страница 65: ... 65 Appendix 2 Physical Dimension Front View and Side view Fig 1 Physical Dimension Front View and Side view ...
Страница 66: ... 66 ...
Страница 67: ... 67 Appendix 3 I F Board Please see the next page ...