12
2 – 5 Level Adjustment
Once the J-hook bolt and concrete are completely dried and fixed, it is time to
adjust the level of the bedways. Two machinist’s levels (accuracy 0.02mm/1000mm) should
be placed on the cross slide of the machine. Adjust the bolt for longitudinal direction of bed
level. For transverse direction of bed level, tighten the nuts until the a c c u r a c y
i s w i t h i n 0 . 0 4 m m / 1 0 0 0 m m .
T h e n
please check the levels again.
If the deviation is resulted from tightening the nuts, it is necessary to make
another adjustment. (See Fig 2-5)
Fig 2-5
Содержание Dynamic 1722S
Страница 6: ...6 ...
Страница 7: ...7 ...
Страница 15: ...15 ...
Страница 16: ...16 ...
Страница 30: ...30 0 27 MD2 0 82 PD10 0 12 MD2 ...
Страница 36: ...36 6 4 Lubrication Location A Oil input cap B Oil drain hole ...
Страница 43: ...43 ...
Страница 44: ...44 8 1 Headstock ...
Страница 50: ...50 8 2 Gearbox ...
Страница 56: ...56 3 Apron ...
Страница 62: ...62 8 4 Bed and Base ...
Страница 65: ...65 8 5 Break System ...
Страница 68: ...68 8 6 Carriage and Crossfeed ...
Страница 70: ...70 35 Washer wave type 6210 2 36 Set screw M6xP1 0x10L 1 ...
Страница 72: ...72 70 Tool post square export 1 1003512802 1003512606 local 1 1003512704 1003512508 ...
Страница 73: ...73 8 7 Tailstock ...
Страница 75: ...75 38 Case 1 1122100502 1122100502 1122100502 39 Wiper 1 1122100100 1122100100 1122100100 ...
Страница 77: ...77 8 8 Steady Rest ...
Страница 79: ...79 8 9 Follow Rest ...
Страница 81: ...81 8 10 Coolant System ...