![Acer Altos R5250 Series Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/acer/altos-r5250-series/altos-r5250-series_user-manual_8205050.webp)
3 System upgrade
32
To install the top cover:
1
Perform the pre-installation instructions described on page 28.
2
Place the top cover on the chassis so that the tabs on the cover
align with the slots on the chassis.
3
Slide the top cover toward the front of the chassis until it is fully
closed
(A)
.
4
Replace the screw on the top cover
(B)
.
Содержание Altos R5250 Series
Страница 1: ...Acer Altos R5250 Series User s Guide ...
Страница 18: ...xviii ...
Страница 19: ...1 System tour ...
Страница 35: ...2 System setup ...
Страница 43: ...3 System upgrade ...
Страница 75: ...4SystemBIOS ...
Страница 103: ...5 System troubleshooting ...
Страница 114: ...5 System troubleshooting 96 ...
Страница 115: ...Appendix A Server management tools ...
Страница 116: ...This appendix gives an overview of the different server management tools supported by your server ...
Страница 124: ...Appendix A Server management tools 106 ...
Страница 125: ...Appendix B Rack mount configuration ...
Страница 126: ...This appendix shows you how to set up the Altos R5250 server in a rack mount configuration ...
Страница 134: ...Appendix B Rack mount configuration 116 6 Fully extend the mounting rails on the rack ...
Страница 138: ...Appendix B Rack mount configuration 120 ...
Страница 142: ...124 ...