![Acer Altos R5250 Series Скачать руководство пользователя страница 130](http://html.mh-extra.com/html/acer/altos-r5250-series/altos-r5250-series_user-manual_8205130.webp)
Appendix B: Rack mount configuration
112
Vertical mounting hole pattern
The four vertical rails of the system rack contain mounting holes
arranged in a manner shown in the figure below:
The system occupies 1U in the rack. Count the U positions and hole
numbers from the bottom up.
The distance from the center of two holes with closer spacing to the
center of the next pair is equivalent to 1U.
Note:
The unit of measurement used in this guide is "U"
(1U = 1.75 inches or 44.45 mm). The total sum of the heights of all
components in the rack measured in "U" cannot exceed the
height of the rack. For more information, refer to the
documentation that came with the system rack.
When installing components, you must start your measurement from
the center of the two holes with closer spacing. Otherwise, the screw
holes on the component may not match those on the rack.
Содержание Altos R5250 Series
Страница 1: ...Acer Altos R5250 Series User s Guide ...
Страница 18: ...xviii ...
Страница 19: ...1 System tour ...
Страница 35: ...2 System setup ...
Страница 43: ...3 System upgrade ...
Страница 75: ...4SystemBIOS ...
Страница 103: ...5 System troubleshooting ...
Страница 114: ...5 System troubleshooting 96 ...
Страница 115: ...Appendix A Server management tools ...
Страница 116: ...This appendix gives an overview of the different server management tools supported by your server ...
Страница 124: ...Appendix A Server management tools 106 ...
Страница 125: ...Appendix B Rack mount configuration ...
Страница 126: ...This appendix shows you how to set up the Altos R5250 server in a rack mount configuration ...
Страница 134: ...Appendix B Rack mount configuration 116 6 Fully extend the mounting rails on the rack ...
Страница 138: ...Appendix B Rack mount configuration 120 ...
Страница 142: ...124 ...