background image

 

Start Up 

1.  Close the discharge gate valve. 
2.  Open the feed and discharge isolation valves.  Water will begin to fill the   

solution tank.   

3.  When water stops flowing, switch the system “ON” using the chemical    

controller.  The pump will circulate water through the blue tubing.   

4.  Begin opening the discharge gate valve to start flow in and out of the system.  
5.  Determine the maximum inlet flow rate by continuing to open the discharge 

gate valve in small increments.  Remember to allow a few minutes each time 
to allow the flow meter to stabilize.  If pump loses prime, maximum inlet 
flow has been exceeded.  Shut down system for a few minutes (which will 
prime the pump), close back on the discharge gate valve and restart the     
system.  Continue this process until the maximum inlet flow is determined.   

6.  Adjust flow through feeder using the discharge gate valve.  The chlorine    

delivery is determined by the flow rate through the chlorinator.  Use the 
graph above to determine proper flow rate.  NOTE:  After adjusting the     
discharge valve, the flow meter will take a few moments to stabilize.   

7.  Check all piping for leaks.   

Operation 

1.  Remove lid from chlorinator and fill with the appropriate amount of PPG 

Accu-Tab

 

 

Blue

 SI

 tablets.  Add no more than the amount of tablets that will 

be used within one week. 

2.  Check pool water for desired chlorine level and adjust flow through chlorina-

tor as needed. 

   

NOTE:  

When pool water circulation stops, flow to chlorinator will stop.  This  

               will stop chlorine delivery. 

Adding Tablets 

1.  Tablets may be added while the system is running.  Take care to protect eyes, 

skin, clothing and other equipment from splashing. Do not inhale fumes. 

2.  Remove lid and add PPG 

Accu-Tab

 

Blue SI tablets. 

3.  Replace lid. 

 

Содержание PowerBase 3070AT

Страница 1: ...ets only Do not mix Cal Hypo tablets with stabilized chlorine or bromine products or other sanitizing chemicals Fire or explosion could result Rev 04 26 10 NSF 50 The PowerBase 3070AT Chlorinator is N...

Страница 2: ...or use ONLY with PPG Accu Tab Blue SI tablets utilizing the PPG patented erosion feeder technology that erodes only the bottom layer of tablets on the sieve plate while keeping tablets above the sieve...

Страница 3: ...e chlorine application point with 1 1 2 PVC pipe or hose Include an isolation valve in the line 9 Plug the power cord into an 110v receptacle 10 If a chemical controller is utilized plug the controlle...

Страница 4: ...4...

Страница 5: ...maximum inlet flow is determined 6 Adjust flow through feeder using the discharge gate valve The chlorine delivery is determined by the flow rate through the chlorinator Use the graph above to determ...

Страница 6: ...on system may develop a build up of scale This should be cleaned on a periodic basis up to twice per year If scale formation is severe more frequent cleanings may be necessary Cleaning may be accompli...

Страница 7: ...hrough the blue tubing Circulate for 10 minutes 10 Open all valves to begin purging acid from system 11 Wash the walls and sieve plate of the feeder with a hose to remove all acid residue Chlorine gas...

Страница 8: ...8 Electrical Drawing Base System...

Страница 9: ...mpers between Terminal 1 4 Terminal 2 6 Electrical Drawing With HHL Pump Switch If a chemical controller is NOT used with the HHL Pump Switch the jumpers should be placed between Terminals 1 and 4 Ter...

Страница 10: ...talled and operated and maintained in accordance with this manual and the instructions ac companying the System iii you at your cost promptly return the System or defective part to such location as ma...

Страница 11: ...11...

Отзывы: