5
Start Up
1. Close the discharge gate valve.
2. Open the feed and discharge isolation valves. Water will begin to fill the
solution tank.
3. When water stops flowing, switch the system “ON” using the chemical
controller. The pump will circulate water through the blue tubing.
4. Begin opening the discharge gate valve to start flow in and out of the system.
5. Determine the maximum inlet flow rate by continuing to open the discharge
gate valve in small increments. Remember to allow a few minutes each time
to allow the flow meter to stabilize. If pump loses prime, maximum inlet
flow has been exceeded. Shut down system for a few minutes (which will
prime the pump), close back on the discharge gate valve and restart the
system. Continue this process until the maximum inlet flow is determined.
6. Adjust flow through feeder using the discharge gate valve. The chlorine
delivery is determined by the flow rate through the chlorinator. Use the
graph above to determine proper flow rate. NOTE: After adjusting the
discharge valve, the flow meter will take a few moments to stabilize.
7. Check all piping for leaks.
Operation
1. Remove lid from chlorinator and fill with the appropriate amount of PPG
Accu-Tab
Blue
SI
tablets. Add no more than the amount of tablets that will
be used within one week.
2. Check pool water for desired chlorine level and adjust flow through chlorina-
tor as needed.
NOTE:
When pool water circulation stops, flow to chlorinator will stop. This
will stop chlorine delivery.
Adding Tablets
1. Tablets may be added while the system is running. Take care to protect eyes,
skin, clothing and other equipment from splashing. Do not inhale fumes.
2. Remove lid and add PPG
Accu-Tab
Blue SI tablets.
3. Replace lid.