![Accu-Flo Meter Service Red Jacket AGUMP150S1 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/accu-flo-meter-service/red-jacket-agump150s1/red-jacket-agump150s1_installation-operation-service-and-repair-parts_456015019.webp)
— 13 —
16: Install excess wire into wiring compartment. Replace wiring compartment cover.
Torque to 35 ft lb (50 N•m). Thread sealant should not be used.
17: Install eyebolt plug, use approved non-setting thread sealant and torque to
50 ft lb (70 N•m).
C
ONDUIT
B
OX
W
IRING
ALWAYS DISCONNECT and LOCK or TAG OUT the power
before starting to service the pump.
1:
Connect electrical conduit through approved fittings to conduit box.
2:
Remove cover from conduit box.
3: Connect wires from power supply to wires in the conduit box. Install ground wire as
shown if applicable. Replace cover, do not use thread sealant on dual box. Thread
sealant required on single box.
Figure 2.6 Wiring schematic
ORANGE
BLACK
CAPACITOR
ORANGE
BLACK
RED
IN FROM
ELECTRICAL
CONNECTOR
OUT TO
PUMP PIGTAIL
Figure 2.7 Conduit box wiring
ELECTRICAL
CONNECTOR ASSY.
GREEN GROUNDING
SCREW
GROUND WIRE
CUP WASHER
TERMINAL
EXTERNAL TOOTH
LOCK WASHER
POWER LEADS
TO PUMPS
CONDUIT BOX
CONDUIT
DUAL BOX
SINGLE BOX
CONDUIT
ELECTRICAL
CONNECTOR ASSY.
GREEN GROUNDING
SCREW
GROUND WIRE
CUP WASHER
TERMINAL
EXTERNAL TOOTH
LOCK WASHER
POWER LEADS TO
PUMP
CONDUIT BOX
DANGER
Содержание Red Jacket AGUMP150S1
Страница 1: ...042 153 1 Rev C 12 00 4 Submersible Petroleum AG Pumps INSTALLATION OPERATION SERVICE REPAIR PARTS ...
Страница 14: ... 8 4 Petroleum AG ...
Страница 36: ...4 Petroleum AG PACKER MANIFOLD ASSEMBLY PARTS SIDE VIEW 8 12 13 14 11 10 9 TOP VIEW 6 6 4 7 2 2 5 1 3 30 ...
Страница 38: ...4 Petroleum AG FSA 1 2 3 4 4 4 PUMP PARTS 32 ...