10
4. Repeat steps 2 and 3 to set the minutes, day,
month, and year. The flashing field is the one that
is being changed.
5. Once the year is set, press and
hold
until the
flashing test strip symbol appears. The time and
date are now set.
6. See Chapter 4, “Meter Set‑up” to set other
options.
Note:
After the battery is changed, the meter automatically prompts the operator to confirm the time and date
when it is turned on.