PIPE CONNECTIONS 

(CUT)

Fig. 1

PIPE CONNECTIONS  

(

FLARING

)

Fig. 3

PIPE CONNECTIONS   

(B

URR

 REMOVAL)

Fig. 2

PIPE CONNECTIONS  

(FI

XING

)

Fig. 4

3.

OUTDOOR UNIT INSTALLATION

3.1 GENERAL INDICATIONS

When choosing the installation position, respect carefully the 

following indications:

Fig. 5

-

Make sure that the difference between the INTERNAL UNIT

and the UNIT

 

OUTSIDE is not greater than 5.0 m.

- The appliance must be installed so that the influences

 

of

adjacent structures and / or the effects of climatic conditions

details (snow, wind, etc. ...) do not compromise the

 

product

operation and / or personal safety e

 

of assets.

- Make sure that the space at the back of the unit is

 

greater than

30 cm. The front must have more than 60

 

cm. of space.

- Ensure that there are no obstacles to free movement

 

of air

through heat exchangers: A) do not dispose

 

plants or animals

directly close to the air flow;
B) avoid installation in corners where it is usually deposited

dust, leaves and anything else that can reduce efficiency

of the exchangers obstructing the passage of air (Fig 5).

- Position the air discharge so that the flow is not

 

hampered in

any way. In the case of strong winds, make sure

 

the fan works

correctly, positioning the unit

 

longitudinally, along a wall or using

one

 

shielding

Содержание HUB RADIATOR PACK CF 3.0

Страница 1: ...ATION HUB RADIATOR PACK CF Factory made high efficiency integrated hybrid system patented heat pump with direct exchange refrigerant water to produce DHW heating and air conditioning HUB RADIATOR PACK...

Страница 2: ...2...

Страница 3: ...3 5 1 4 5 1 5 5 1 6 5 1 7 5 2 6 2 1 6 2 2 6 2 3 6 3 7 3 1 7 3 2 8 3 3 8 3 4 8 3 5 8 3 6 Pump Down 8 3 7 9 4 INSTALLATION OF INDOOR UNITS 10 4 1 Choosing the place of installation 10 4 2 Technical data...

Страница 4: ...tructions 27 9 5 General system checks 27 10 START UP 27 10 1 First start up checks 27 10 2 Starting up 27 11 REPAIR COMPONENTS REPLACEMENTS 27 11 1 Refrigerant circuit 27 11 2 Drying and vacuum of th...

Страница 5: ...be installed at wall or recessed the indoor unit is supplied complete with all the appropriate ones internal copper exchangers R410A refrigerant gas connections DHW connections air vent valve safety v...

Страница 6: ...2 x 0 75 mm 2 x 2 20 A curv D Table 2 Tightening torque Torque Tightening min max N m 1 4 14 18 3 8 33 42 5 8 63 77 Table 3 Refrigerant charge m Max Add refrigerant quantity g m HR 3 0 5 15 5 20 HR 7...

Страница 7: ...not compromise the product operation and or personal safety e of assets Make sure that the space at the back of the unit is greater than 30 cm The front must have more than 60 cm of space Ensure that...

Страница 8: ...at each tube both the gas side tubes and the liquid between internal group and external group has been connected in the correct way and that all the wiring necessary for the testing have been carried...

Страница 9: ...pressure gauge using the refrigerant gas Completely close the liquid valve Turn on the machine in cooling mode When the pressure of the pressure gauge goes from 0 to 0 5 kg 2G cm between 14 2 and 7 1...

Страница 10: ...as connection 19 Gas connection R410A 5 8 4 1 CHOICE OF INSTALLATION SITE OF THE HYBRID SYSTEM When determining where to install the internal unit of the system hybrid HUB RADIATOR PACK CF take the fo...

Страница 11: ...that the support surface is regular Use the bracket as a template and mark the position of the holes from to achieve x 3 Wilo Yonos Pico 25 18 60 4 5 7 5 4 75 4 6 3 4 3 4 1 2 1 2 230V 1 50Hz 1447 720...

Страница 12: ...pipes the weight of which must not burden on the appliance properly insulate the pipes to find the right ones heat losses H Connect a special safety drain in correspondence of the 1 2 female threaded...

Страница 13: ...or exclude them safety devices In the event of repeated shutdowns of the boiler it is necessary have the air intake flue gas exhaust ducts checked which may be blocked or inadequate for the disposal o...

Страница 14: ...tion that the total path of the fumes from the exit point of the same from the terminal to their outlet from the external perimeter of the balcony including the height of the eventual balustrade of pr...

Страница 15: ...temperatura di spegnimento dopo accensione bruciatore 0 20 0 DO NOT MODIFY THIS VALUE P61 Selezione allarme temperatura scarico fumi 20 150 105 P62 Not used P63 Not used P64 Not used P65 Anti legionel...

Страница 16: ...0 1 1 DO NOT MODIFY P20 Selection of the minimum value of the DHW 35 50 35 P21 Low temperature zone selection 0 1 0 0 High temperature 1 Low temperature P22 Not used P23 Selection of pump activation t...

Страница 17: ...bustion regulation CO2 4 7 3 CHECK AND ADJUSTMENT OF THE GAS VALVE PREMISE The boiler by means of the BEST function is suitable automatically combustion according to the conditions of installation the...

Страница 18: ...s specified below Control operations general check of the integrity of the boiler check the tightness of the gas circuit of the boiler and the gas supply network to the boiler control of the boiler su...

Страница 19: ...s network and the electricity grid The materials of which the boiler is made are all recyclable Once dismantled the boiler must be disposed of in compliance of the legislation in force in the country...

Страница 20: ...o use the boiler only it is necessary to set IC to ON and set DC to EMERGENCY Simultaneously put the CD control in STAND BY by pressing the SUN button Booster terminal board Technical water probe Boos...

Страница 21: ...the integration boiler it is necessary to set IC to ON and set DC to INTEGRATION In this way the control unit will decide when the help of the boiler is needed which will work in support of the heat...

Страница 22: ...12 3 03 2 91 10 3 45 3 37 3 29 3 20 3 10 2 98 11 3 55 3 46 3 37 3 28 3 18 3 06 12 3 64 3 55 3 45 3 36 3 25 3 13 13 3 75 3 64 3 54 3 44 3 33 3 20 14 3 85 3 74 3 63 3 52 3 41 3 28 15 3 95 3 83 3 72 3 6...

Страница 23: ...ting C 30 35 40 45 50 55 1 074 10 2 96 2 59 2 25 1 91 1 59 1 27 HR 3 0 9 3 04 2 67 2 32 1 98 1 65 1 33 8 3 14 2 75 2 39 2 05 1 71 1 39 7 3 23 2 84 2 47 2 12 1 78 1 46 6 3 32 2 92 2 54 2 19 1 84 1 52 5...

Страница 24: ...cold water filter 19 Secondary plate heat exchanger 20 Domestic hot water temperature sensor 21 Automatic by pass integrated on plate heat exchanger 22 Motorized 3 way valve S Condensate drain G Gas i...

Страница 25: ...an speed x100 TMax operating temperature in heating mode Total expansion vessel capacity 6 5 TECHNICAL FEATURES BOILER HUB RADIATOR PACK CF TECHNICAL FEATURES kW bar bar bar bar l min V Hz A W IP Kg m...

Страница 26: ...d mode with the active boiler for DHW production and external booster in active heat pump to produce chilled water up to 4 C per power the hydronic terminals IC ON OFF O I CD 2 0 0 1 2 3 4 5 H m 4 6 8...

Страница 27: ...UP Before proceeding with the commissioning of the appliance you need to make sure that the safety conditions and all the provisions listed in this manual has been complied with the fixing to the sup...

Страница 28: ...inants that have been must be eliminated introduced to clean the circuit or to effect the operations carried out WARNING Do not inhale the refrigerant vapors coming from burned compressors as it can b...

Страница 29: ...as to obtain a temperature of system delivery that increases in a way proportional to decreasing air temperature external To proceed with this function set the value of the parameter ST08 and ST03 at...

Страница 30: ...ler Boiler differential boiler Boiler activation delay time boiler SET POINT external air compressor deactivation Compressor activation external air differential PARAMETERS OF ALARMS FUNCTIONS Probe f...

Страница 31: ...bled but not active the icon is off ___________________________________________________ On during access to the functions menui ___________________________________________________ Lit if the resistanc...

Страница 32: ...ws exit from parameter programming 2 contemporary pressure prolonged keys allows entry into manual defrost ___________________________________________________ Remote terminal Regarding the use of the...

Страница 33: ...ure falls below 90 C P1 probe alarm PB1 probe alarm PB2 probe alarm PB3 faulty probe or resistive value out of range faulty probe or resistive value out of range probe alarm PB4 faulty probe or resist...

Страница 34: ...al probe 3 Substitution of tract 1 Replacement of the outdoor unit probe 2 Connection cable replacement external probe 3 Substitution of tract 1 Thermostat replacement 2 External booster recharge 3 co...

Страница 35: ...int ST21 Set massimo ambiente in chiller ST18 110 230 C F Dec int ST22 Set point ambiente in p d c ST24 ST25 C F dec int ST23 Differenziale ambiente in p d c 0 0 0 25 0 45 C F Dec int ST24 Set minimo...

Страница 36: ...pen contact 0 1 CF16 Polarity ID5 0 Active close contact 1 Active open contact 0 1 ventilatore di mandata 13 Allarme termica pompa acqua condensatore 14 Flussostato condensatore CF09 CONFIGURATION ID2...

Страница 37: ...sent 1 Continuous operation in ON OFF output 2 Operation on compressor request 3 Continuous output operation 4 20mA 4 Operation on request of the compressor 4 20mA 0 4 CO12 Compressor 0 Enabled 1 OFF...

Страница 38: ...6 Minimum defrost alarm 0 Not enabled 1 Enabled 0 1 dF17 Minimum alarm delay when reversing the 4 way valve 0 250 Sec FA09 Maximum fan speed in summer 30 100 FA10 Minimum fan speed temperature pressur...

Страница 39: ...utput relay polarity 0 Output without voltage in normal conditions with voltage in the presence of an alarm 1 Output with voltage in normal conditions without voltage in the presence of an alarm 0 1 A...

Страница 40: ...CE dei prodotti comporta il controllo costante of production with the aim of guaranteeing the conformity of the appliances with the safety and performance characteristics of the verified samples The...

Страница 41: ..._________ Raffrescamento estivo Produzione ACS Riscaldamento Distanza tra unit interna ed esterna max 15 m Dislivello tra unit interna ed esterna max 5 m Le tubazioni delle linee frigorifere 1 4 3 8 p...

Страница 42: ..._________________________________________________________ Attenzione la mancata effettuazione del primo avviamento per cause non dipendenti dall unit comporter una seconda visita la quale sar a voi di...

Страница 43: ..._____________ ___________ ________________ BOOSTER POSIZIONATO A TERRA A MURO A FINESTRA SU STAFFE ANTIVIBRANTI MENSOLE A TETTO ALTRO SU BASI A SOSPENSIONE A RINGHIERA INSTALLAZIONE CON PONTEGGIO SI N...

Страница 44: ...AICO SPENTO FUNZIONAMENTO IN POMPA DI CALORE BOOSTER 1 TEMPERATURA DI EVAPORAZIONE U E C Pb3 _______ TEMPERATURA ACQUA TECNICA C Pb1 _______ NB TEMPERTATURA DI INIZIO CONDENSAZIONE C _______ Attendere...

Страница 45: ...ence must be made to the natural or legal person who has purchased the Product regardless of whether the seller is A2B ACCORRONI E G or other person marketing branded products A2B ACCORRONI E G This w...

Страница 46: ...rroni mediante ogni opportuna operazione di trattamento manuale ed informatico per finalit funzionali all adempimento degli obblighi derivanti dal contratto di fornitura di beni servizi da parte di Ac...

Страница 47: ...provisions of the law on the subject of deduction for the energy requalification costs of the existing building heritage the A2B Accorroni E G Ltd DECLARES that the product complies with the European...

Страница 48: ...corroni E G s r l Via d Ancona 37 60027 Osimo An Tel 071 723991 web site www accorroni it e mail a2b accorroni it A2B Accorroni E G S r l reserve the right to make changes without prior notice TECHNIC...

Отзывы: