5
FINAL ADJUSTMENTS
PAN ROLLER TO METERING ROLLER PRESSURE
This pressure is adjusted by loosening the set screw (#3) and
rotating the pan roller eccentric brackets. Rotating the brackets
toward the metering roller increases the stripe and vice-versa. This
stripe should be 5/32" (4mm). Jog the press to check.
WATER LEVEL IN PAN
Attach the circulator filler pipe to the water pan and connect the
feed line and valve. Connect the drain hose to the large pipe at the
bottom of the pan. Insert the weir into the drain hole at the bottom
of the pan. Shut off the feed valve completely and turn on the
circulator pump. Slowly open the feed valve until fountain solution
slowly flows from the end of the pipe. The weir will automatically
control the water level inside the pan. Beware of adjusting the water
feed too high as this will overflow the pan.
YOU ARE NOW READY TO PRINT
3
INTERMEDIATE TO METERING ROLLER PRESSURE
This pressure is adjusted by loosening the lock nut in the center of
the cap (#2) and turning the set screw (#1). Turning the screw in will
increase the stripe and vice-versa. Jog the press and observe the
stripe between these two rollers. It should be 5/32" (4mm). Setting
this stripe automatically sets the intermediate to oscillator pres-
sure.
5
5/32" (4mm)
5/32 (4mm)
Содержание Crestline Altra Series
Страница 6: ...6 ...
Страница 8: ...8 ...
Страница 10: ...10 ...
Страница 12: ...12 ...
Страница 14: ...14 ...
Страница 16: ...16 ...
Страница 18: ...18 ...
Страница 20: ...20 ...
Страница 22: ...22 ...
Страница 24: ...24 ...
Страница 26: ...26 ...
Страница 28: ...28 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 38: ...38 ...
Страница 39: ...39 ...
Страница 40: ...40 ...
Страница 41: ...41 ...