139
English
6.14 Schedule
Schedule selection:
Separate schedules can be assigned to each process (e.g. events, intervals etc.).
The corresponding process is then only active in the defined time schedule (see
list).
Start time:
Start of the active time schedule.
End time:
End of the time schedule.
Add:
Adds a day to the active time schedule. Several time schedules can be defined for
each day.
Delete:
Deletes the time schedule selected in the box for the day.
Use the same time schedule every day:
The configuration from Monday (“Mo”) is used for each day of
the week.
Sample schedule:
Содержание TVIP51500
Страница 78: ...English TVIP51500 TVIP51550 uk User manual Version 05 2011 ...
Страница 143: ...143 English Accept the settings by pressing OK or cancel them by pressing Cancel ...
Страница 366: ...366 Dansk Anvend de valgte indstillinger med OK eller fortryd de valgte indstillinger med Afbryd ...
Страница 390: ...390 Resolution string 1 6 MPEG4 video resolution root Image I0 Appearance Resolution 704x480 ...