background image

Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE GAZEBO

MODEL: ADGAZEBO63

6.12m W x 3.11m D x 2.60m H

Model: ADGAZEBO63

4/12/23

1.00

8  

 

 

3. 

On the middle rib,

 

fasten panel to low side 

beam with a tek 14 x 125 mm 

FAST104.

Don’t over-tighten and crush the panel.

For further screw position detail see Fastening 

layout below.

4. 

Check for consistent overhang along end beam 

- adjust if required.

Fasten with a tek 14 x 125 mm 

FAST104

 at the 

midpoint of side beam - in the sheet pan.

5. 

On the middle rib

fasten to front beam with 

another tek 14 x 125 mm 

FAST104

.

Fixed panel

A. Overlap rib

B. Press here

Complete

Next panel

‘Bottom skin’ male & 

female features align

FRONT VIEW - Laying the roof panels

ROOF PANELS

Front

Rear

4

3

5

Side beam

TOP VIEW - Fastening layout

6. 

Fasten roof panels to beams with 

a tek 14 x 125 mm 

FAST104 

at the 

remaining positions

.

NOTE: rib fixed to centreline of beam 

unless noted otherwise.

NOTE: 

3

4

 & 

5

 are the screws done 

earlier.

Don’t over tighten and crush the panel.

7. 

Use shorter tek screws with neoprene 

washers 

FAST101

 at the locations 

marked with ‘x’ where the ‘top skins’ 

overlap.

3

5

4

x

x

x

x

x

x

x

x

x

x

First

panel

Last

panel

Содержание ADGAZEBO63

Страница 1: ...www abscosheds com au For construction in non cyclonic areas Wind rating N3 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800 029 701 NOTE Concrete s...

Страница 2: ...detail to gain a thorough understanding of assembly methods and associated details Unpack and carefully identify and check off all the parts against the parts described and illustrated on Components...

Страница 3: ...mm 3115 mm Downpipe 80 mm RWG 21 1 QTY CHECK 2925 mm 2680 m m 5680 m m 3045 m m 3140 mm 3105 mm 1 QTY CHECK TU 8 QTY CHECK BK3 1 QTY CHECK 2 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 200 QTY CHEC...

Страница 4: ...post 2 Fasten using four FAST100 tek screws and 5 16 nut setter Make sure screws are inset 20 mm from the edges of bracket for beam clearance To keep the parts aligned while fastening use a clamp or...

Страница 5: ...f this manual Drill the holes for the anchors using the post baseplate as a template Use a hammer drill with a 12mm diameter masonry drill bit drill to a depth of 100mm Fasten to foundations with four...

Страница 6: ...ke sure the ends of the beam are as far as they can go into the brackets there will be a small gap at the high side due to angle Fasten each end with four FAST100 tek screws as before 6 Repeat these s...

Страница 7: ...ely trim flush with a Stanley knife B Check if the steel bottom skin corner is bent down below the bottom face Bend it up with pliers C To increase weather protection turn up the pans 15 degrees with...

Страница 8: ...t pan 5 On the middle rib fasten to front beam with another tek 14 x 125 mm FAST104 Fixed panel A Overlap rib B Press here Complete Next panel Bottom skin male female features align FRONT VIEW Laying...

Страница 9: ...Bent tab hard up against end Top face sits on two sheet ribs Bottom face covers the Z flashing 15 90 o 0 TR36 flashing will overhang roof panel at the rear and we ll need to trim to make the gutter fi...

Страница 10: ...the front end of the structure take one TR37 flashing and place over the front flashing and roof panels as shown 2 Take the second TR37 flashing and place alongside butted against the first trim so i...

Страница 11: ...uphill gutter is notched and inside the other 2 Put silicone in the joint and then use two rivets FAST102 per side 3 Take a gutter end stop RWG25 and test fit it over an end of the gutter Mark off the...

Страница 12: ...point shown 10 Take a string line and make a line from the high to low point 11 Align the bottom of the gutter bracket with the marks and fasten to rear beam using rivets FAST102 Place middle bracket...

Страница 13: ...en and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches the unde...

Страница 14: ...art 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Design...

Отзывы: