Absco Industries
Assembly Instruction Manual
ABSCO SIGNATURE GAZEBO
MODEL: ADGAZEBO63
6.12m W x 3.11m D x 2.60m H
Model: ADGAZEBO63
4/12/23
1.00
5
POST LOCATIONS
ANCHORING
Use a chalk line, or equivalent, to mark nominal
outside dimensions onto foundation.
The diagonal measurement will confirm
squareness.
NOTE:
For illustrative purposes the gutter will be at the
rear for the rest of this manual.
Drill the holes for the anchors using the post
baseplate as a template.
Use a hammer drill with a 12mm diameter
masonry drill bit drill to a depth of 100mm
Fasten to foundations with four concrete screws
FAST103
per post using a 16mm socket.
NOTE: Uneven foundations will cause posts to
pull away from vertical.
Position posts in the corners.
• Shorter
PT3
posts to the gutter side.
• Taller posts
PT4
to the other side.
• Make sure the faces with the brackets are all
inward.
These internal dimensions can be used to
confirm alignment.
FRONT
FRONT
6021
5521
6066
6733
3014
2514