background image

Setting up the energy meter     |

27

NOTE

Explanation of the fallback value

If you are not sure which static maximum current the charging group should be limited to if the time limit (see be-

low) is exceeded, enter the value 

0 A

 here: This will cause all charging operations to be interrupted in the event 

of a fallback.

WARNING!

Setting the other controller parameters

If required, you can also set the other controller parameters on this page. However, if you are unsure what each 

parameter does, you should leave the value at the default setting!

 

ƒ

Minimum Value:

 Specify a minimum current for the system here. The recommendation is 

0 A

, although you 

may also increase this value if you want a minimum current in the installation.

 

ƒ

Time Limit: 

Set how long the communication between the energy meter and the controller / control unit 

needs to be interrupted before the charging group is set to the 

Fallback Value

 here (see above).

 

ƒ

Start Value:

 Set the starting current for the charging group until the measured values from the energy meter 

are available here. It is recommended to set the 

Start Value

 and 

Fallback Value

 the same.

 

ƒ

Reading frequency:

 Set the time interval for retrieving the meter value here. The value must be greater 

than 3 seconds. The recommendation is 

5 seconds

 

ƒ

Buffer width:

 Set a safety buffer here to avoid frequent and short-term oscillation of the current above 

the main terminal current limit. The recommendation is to set the buffer width to 10% of the main terminal 

current limit.

 

ƒ

Validation Count:

 Set the number of measurements until the current setting is readjusted here. The product 

of the 

Validation Count

 and the 

Reading frequency

 (see above) results in the time until the current set-

ting is readjusted (for example: 5 * 5 seconds = 25 seconds).  

However, if the maximum current is exceeded, the current setting immediately readjusts.

17 

Confirm your settings by clicking on the tick 

 

in 

the 

Actions

 column.

18 

Navigate to the bottom of the 

Products > Instal-

lation

 tab and click the 

Create new configura-

tion

 button.

Содержание METERL

Страница 1: ...EN Article No 0301676_EN_a Installation and Configuration Guide METERS METERL ...

Страница 2: ...207 Lauf an der Pegnitz Germany 49 0 9123 188 0 49 0 9123 188 188 info abl de www ablmobility de Customer Service 49 0 9123 188 0 service abl de www ablmobility de en service support Revision 0301676_EN_a Version 23 05 22 Th i n k b e f o r e y o u p r i n t ...

Страница 3: ...oducts 8 The energy meter at a glance 10 The display at a glance 11 The cable type current transformer at a glance 11 Mechanical and electrical installation 13 Selecting the connection mode 14 Installation guidelines 14 Installation of the energy meter and the cable type current transformers 15 Data connection with the controller of a group installation 18 Setting up the energy meter 19 Setup via ...

Страница 4: ...rnal load management system for a single controller charging station or a group in stallation controlled via an eMH2 or eMH3 controller wallbox an eMC2 or eMC3 controller charging pole or via the 1V0001 1V0002 external control unit METERS METERL allows dynamically controlled efficient distribution of the available charging current to up to 16 charge points by measuring the energy flow via the thre...

Страница 5: ...OTE Indicates important information for operation or installation Sections marked with this symbol indicate further important information and features necessary for successful operation Actions marked with this symbol should be carried out as required Passages marked with this symbol contain valuable additional information Safety instructions The safety notices serve to ensure the proper and safe ...

Страница 6: ...alist electrical contractor who has carried out the installation of your charging station and accessories y The product housing has been damaged mechanically or the housing cover has been removed or can no longer be closed y Sufficient protection against splashing water and or foreign objects is no longer provided y The product does not function properly or has been otherwise damaged WARNING Obser...

Страница 7: ...M210 Energy meter included in METERS and METERL front and side view all dimensions in mm Cable type current transformers up to 300 A Current transformer for attachment to a single power line included in METERS front and side view all dimensions in mm Cable type current transformers up to 600 A Current transformer for attachment to a single power line included in METERL front and side view all dime...

Страница 8: ... you have is the system suitable for your application METERL 1 Stück Externes Lastmanagement L ABL GmbH Albert Büttner Straße 11 D 91207 Lauf www abl de Items supplied METERS METERL are supplied with the following components Energy meter 1 pc Cable type current transformer 300 or 600 A 3 pcs Download note multilingual 1 pc Zubehör Download Hinweis Stand 10 2019 Produktnummer 0301431_b Die ausführl...

Страница 9: ...harging sockets h 1 460 mm w 440 mm d 200 mm Housing without protrusions Charging pole eMC3 Controller 3P4412 3P4435 Calibration law compliant charging pole from ABL with two charge points either with permanently integrated spiral charging cables or with charging sockets h 1 661 mm w 590 mm d 220 mm Housing without protrusions External control unit 1V0001 1V0002 Controller unit from ABL without it...

Страница 10: ... Setting up the energy meter on page 19 C Red LED This LED flashes red proportionally to the measured energy D Enter key This button is used to open a parameter menu to switch between the modes of the toggle key B and to con firm exit a parameter menu You can find further information on key operation in section Setting up the energy meter on page 19 E Output and RS485 terminals The static outputs ...

Страница 11: ...eter software is displayed here Use the toggle key B to switch between the menus and the enter key D to activate editing in this menu K Value range The current value for the selected menu is shown here L Increase decrease symbol The selected menu current value is increased The selected menu current value is decreased You can switch between and by pressing the enter key D The cable type current tra...

Страница 12: ...le the black wire L is as signed to the even numbered terminals 2 4 and 6 NOTE Assignment according to connection mode Please note that depending on the selected connection mode see Selecting the connection mode on page 14 not all cable type current transformers may be required In connection mode 1P only one cur rent transformer is connected to terminals 1 and 2 of the energy meter terminals 3 to ...

Страница 13: ...nt measurement may have to be approved by your local grid operator Contact your local grid operator for further information Section current measurement In contrast with section current measurement the cable type current transformers are installed behind the tap for the charging stations and the energy meter can be installed nearby in a distributor in the building This measurement only takes into a...

Страница 14: ...tible connection modes The energy meter supplied with METERS METERL supports other connection types in principle although these are not required in practical use as a load management system Therefore always make sure that the energy me ter is set to the appropriate connection option in the SYS menu Setting up the energy meter on page 20 Installation guidelines Depending on the type of current meas...

Страница 15: ...nt transformers You will need the following tools and components for the installation Phillips screwdriver Optional Cable tie 1 per transformer DANGER Dangerous electrical currents Always observe the 5 safety rules 1 Cut power source 2 Secure all cut off devices 3 Verify absence of voltage 4 Ground and short circuit 5 Cover or bar access to adjacent components under voltage WARNING Electrical inst...

Страница 16: ...ent in the distributor 4 Connect the energy meter to the mains via specially fused cable taps F 315 mA y Assign the screw terminals 7 8 9 and on the energy meter in accordance with the connection mode selected page 14 F 5 Connect the fixed connection cables of the current transformers to the energy meter y Assign the connection terminals 1 2 3 4 5 and 6 on the energy meter in accord ance with the ...

Страница 17: ...cted connection mode K 5A L WARNING Adhering to the electrical energy flow direction Always observe the energy flow direction and thus the installation direction for the power cable indicated by the arrow on the current transformer Otherwise the energy meter connected to the current transformer cannot measure reliable current values WARNING Pre condition for the installation of a cable type curren...

Страница 18: ...group installation one of the two Modbus interfaces remains unassigned while the other is used for communication with the extender charging stations Wire the free interface in the controller to the RS485 interface of the energy meter Connect the interfaces as follows Charging station with spring terminals Connect the contacts as follows Meter contact Charging station spring terminal METER B METER ...

Страница 19: ...ther information on this in the corresponding installation manual for the charging station Setting up the energy meter To ensure accurate measurement the energy meter must be set up via its system and parameter menus This can be done using the toggle and enter keys as well as the visual feedback on the display Toggle key Navigation within the menus Select next previous option Edit a parameter valu...

Страница 20: ...ing the factory default password If required you can set a new password between 000 and 999 via the CnGPASS menu to protect the energy me ter against unauthorised access To change the password briefly press the enter key select a new password with the toggle key then confirm the new password by holding the enter key for about 3 seconds If you change the password you must keep it in a safe place fo...

Страница 21: ... key to select the appropriate transformer ratio and hold the enter key for about 3 seconds to confirm y METERS Select the value 60 y METERL Select the value 120 1S 3S 7 Use the toggle key to select the Add menu for the serial address of the energy meter and briefly press the enter key 1S 1S 8 Use the toggle key to select the address value 17 and hold the enter key for about 3 seconds to confirm 1...

Страница 22: ... toggle key to select the parity EVEN and hold the enter key for about 3 seconds to confirm 1S 3S 13 Use the toggle key to select the bStoP menu for the stop bit of the energy meter and briefly press the enter key 1S 1S 14 Use the toggle key to select the value 1 for the stop bit and hold the enter key for about 3 sec onds to confirm 1S 3S 15 Use the toggle key to select End and briefly press the ...

Страница 23: ...carry out an update in any case The instructions included in the installation package describe step by step how to perform the update The application offers a role based concept that restricts the editing of selected parameters Owner The Owner may view all information about the application and the installed charging stations perform updates and set up data communication in the system Installer The...

Страница 24: ...online appli cation where you are automatically logged in with the Owner role WARNING Manually setting up the network settings If you are unable to connect to the application check your computer s network settings and if necessary adjust them as follows Network 169 254 0 0 Subnet mask 255 255 0 0 Address 169 254 1 2 4 Click the Change role selection menu in the top right and select the Installer r...

Страница 25: ...then displayed next to the controller and the already selected extender charging stations in the Products Installation tab 9 Navigate to the bottom of the Products Instal lation tab and click the Create new configura tion button 10 Then click Perform reconfiguration to restart the system 11 After restarting switch to the Overview Gener al tab this shows at a glance whether your system is set up co...

Страница 26: ... Installation tab and in the Actions column click the button for the Con troller charging station marked with C 16 Set the parameters for the controller y Maximum Value Enter the maximum charging current for the entire charging group here for example 160 A y Fallback Value Enter a static maximum current for the charging group here if the controller does not receive a measured value from the energy...

Страница 27: ... above Start Value Set the starting current for the charging group until the measured values from the energy meter are available here It is recommended to set the Start Value and Fallback Value the same Reading frequency Set the time interval for retrieving the meter value here The value must be greater than 3 seconds The recommendation is 5 seconds Buffer width Set a safety buffer here to avoid f...

Страница 28: ...ation 28 19 Then click Perform reconfiguration to restart the system 20 Switch to the Overview General tab this shows at a glance whether your system is set up correctly This completes the setup of the charging group and the charge management ...

Страница 29: ... digital output Dielectric strength 4 000 VAC RMS for 1 minute Noise suppression ratio CMRR 100 dB 48 to 62 Hz EMC in accordance with EN62052 11 Electrostatic discharges 15 kV air discharge Immunity to electromagnetic fields Test with current 10 V M at 80 to 2 000 MHz Test without current 30 V m from 80 to 2 000 MHz Burst noise On the current and input voltage measuring circuit 4 kV Immunity to co...

Страница 30: ...VA 10 VA IP rating IP rating Explanation IP20 Protection against penetration of solid foreign bodies with a diameter greater than 12 5 mm IP40 Protection against penetration of solid foreign bodies with a diameter greater than 1 mm Data cable recommendations The following data cables are recommended for wiring up the RS485 interfaces of the energy meter to the charging station Designation Cross se...

Страница 31: ...other spring terminal L of the next Extender charging station In both cases the individual wire strands of the Ethernet cable must be allocated as illustrated below Spring terminal Energy meter RJ45 plug Top view of terminal ABL bus allocation Connection terminal PIN allocation Top view of RJ45 plug 1 2 3 4 5 6 7 8 B M A METER B M A CONTROL CONTROL A 1 8 1 1 2 3 4 5 6 7 8 B M A METER B M A CONTROL...

Страница 32: ... any obli gation on the part of the manufacturer The manufacturer does not take responsibility for any loss and or damage that occurs because of the data or possible misinformation contained in this manual Disposal advice The crossed out rubbish bin symbol indicates that electrical and electronic devices including accessories must be disposed of separate from household refuse The materials are rec...

Страница 33: ...Copyright and disclaimer 33 ...

Страница 34: ...MADE IN GERMANY ABL GmbH Albert Bu ttner Straße 11 91207 Lauf an der Pegnitz Germany 49 0 9123 188 0 49 0 9123 188 188 info abl de www ablmobility de ...

Отзывы: