Insert the wall plugs (4 pcs.) into the drilled mounting points.

10 

Fasten the housing base to the mounting surface in the mounting position using (4) fixing screws  

(tool: screwdriver).

11 

Remove the M32 sealing cap for the power supply cable at either the top or the bottom of the housing base.

12 

Insert the power supply cable through an M32 cable gland with strain relief and screw the cable gland hand-tight 

into the housing base.

13 

Cut the power supply cable to the length required for connection to the RCCB and strip starting at the strain relief 

of the cable gland (tools: cable cutter, wire stripper).

14 

Strip the wires of the supply line, put ferrules on the wires and crimp on the ferrules (tools: wire stripper, crimp 

tool)

15 

Operate the spring loaded mechanism of the PE terminal and clamp the 

PE

 protective earth conductor onto it. 

16 

Insert the 

L

 and 

N

 conductors of the power supply cable into the RCCB terminals and screw down hand-tight (tool: 

Pozidriv screwdriver).

Conductor colour*

Connector RCCB

Description

Brown

L

Phase 1 current-carrying conductor

Blue

N

Neutral

Green-Yellow

PE

Protective earth

* Colour-coding is not internationally standardised and may therefore vary

The electronic components of your wallbox will be damaged if a voltage above 250 V is applied between the 

current-carrying conductor 

L

 and the neutral conductor 

N

.

This completes the electrical connection of the 1V0001.

Connecting controller/extender communications and commissioning

Tools and materials required:

 M32 cable gland with strain relief, cable cutters, wire stripper, data cable (twist-

ed pair, at least CAT5 or above), Pozidriv screwdriver, Voltmeter

During the installation process, the circuit breaker for the supply cable in the domestic power distribution 

must be switched off until step 7.

Remove the M32 sealing cap for the power supply cable at either the top or the bottom of the housing base.

Insert the power supply cable through an M32 cable gland with strain relief and screw the cable gland hand-tight 

into the housing base.

Cut the data cable to the required length for connecting to the daisy chain circuit board and strip as required (tools: 

cable cutter, wire stripper). 

The daisy chain circuit board is located in the upper left part of the housing base.

Strip the wire strands of the data cable.

Clamp the wires of the data cable onto the left or right hand side terminal block of the daisy chain circuit board.