FES-200
6 Putting into operation
EN - 15
6 Putting into operation
1
Connect the torch system
, hose and rubber connector to the fume extraction system.
2
to the fume extraction system
and fasten it to the extraction hose
(cable assembly) of the torch system
. (Option)
3
Connect the dedusting system to the compressed air.
4
Plug in mains plug.
DANGER
Risk of injury due to unexpected start-up
For the entire duration of maintenance, servicing, mounting, dismounting and repair work, the following
instructions must be adhered to:
• Switch off the power source.
• Pull the mains plug.
WARNING
Hazard due to overheating
Increased wear to the electric motor due to overheating.
• A cool-down period of at least 5 minutes must be observed for every 30 minutes of operating time.
• This value may change depending on the ambient temperature of max. 25°C.
1
Fume extraction system
FES-200
2
Extraction hose (cable assembly)
3
Start-stop pliers, 4 pole (deviating figure possible)
4
Torch system
Fig. 4
Putting into operation
1
2
3
4
NOTICE
• When fastening the start-stop replace pliers
with clamp, make sure that the red dot points in the
direction of the torch system.
Содержание FES-200
Страница 4: ...DE 4 1 Identifikation FES 200 ...
Страница 5: ...FES 200 1 Identifikation DE 5 ...
Страница 25: ...FES 200 13 Anhang DE 25 ...
Страница 28: ...EN 4 1 Identification FES 200 ...
Страница 29: ...FES 200 1 Identification EN 5 ...
Страница 49: ...FES 200 13 Appendix EN 25 ...
Страница 52: ...FR 4 1 Identification FES 200 ...
Страница 53: ...FES 200 1 Identification FR 5 ...
Страница 73: ...FES 200 13 Annexe FR 25 ...
Страница 76: ...ES 4 1 Identificación FES 200 ...
Страница 77: ...FES 200 1 Identificación ES 5 ...
Страница 97: ...FES 200 14 Notizen Notes Notes Notas ES 25 14 Notizen Notes Notes Notas ...
Страница 98: ...ES 26 14 Notizen Notes Notes Notas FES 200 ...
Страница 99: ...FES 200 14 Notizen Notes Notes Notas ES 27 ...