![background image](http://html1.mh-extra.com/html/abicor-binzel/fes-200/fes-200_operating-instructions-manual_451564041.webp)
FES-200
7 Operation
EN - 17
6.3 Establishing the electrical connection
Mains cable and mains plug are pre-mounted. For the mains voltage and the fuse protection, please refer to:
3.1 Technical Data on page EN-9
1
Plug in mains plug.
7 Operation
Fig. 6 Operating elements on page EN-18
1
Plug the mains plug into the socket.
2
on the fume extraction system to the Manual position.
WARNING
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
WARNING
Hazard due to overheating
Increased wear to the electric motor due to overheating.
• A cool-down period of at least 5 minutes must be observed for every 30 minutes of operating time.
• This value may change depending on the ambient temperature of max. 25°C.
CAUTION
• Provide sufficient ventilation during operation of the extraction system
FES-200
.
Содержание FES-200
Страница 4: ...DE 4 1 Identifikation FES 200 ...
Страница 5: ...FES 200 1 Identifikation DE 5 ...
Страница 25: ...FES 200 13 Anhang DE 25 ...
Страница 28: ...EN 4 1 Identification FES 200 ...
Страница 29: ...FES 200 1 Identification EN 5 ...
Страница 49: ...FES 200 13 Appendix EN 25 ...
Страница 52: ...FR 4 1 Identification FES 200 ...
Страница 53: ...FES 200 1 Identification FR 5 ...
Страница 73: ...FES 200 13 Annexe FR 25 ...
Страница 76: ...ES 4 1 Identificación FES 200 ...
Страница 77: ...FES 200 1 Identificación ES 5 ...
Страница 97: ...FES 200 14 Notizen Notes Notes Notas ES 25 14 Notizen Notes Notes Notas ...
Страница 98: ...ES 26 14 Notizen Notes Notes Notas FES 200 ...
Страница 99: ...FES 200 14 Notizen Notes Notes Notas ES 27 ...