EN - 18
BAL.0843.0 • 2021-02-26
8 Putting out of operation
CAT3 PRO
8 Putting out of operation
Decommissioning depends on the respective welding torch.
9 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free
operation. During such activities, observe the following:
9.1 Maintenance intervals
NOTICE
• Consult the documentation for the welding components.
DANGER
Risk of injury due to unexpected start
Improper operation can lead to serious injuries that could result in death.
The following instructions must be adhered to during all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Close off the compressed air supply.
• Close off the gas supply.
• Disconnect all electrical connections.
• Switch off the entire welding system.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
NOTICE
• Only qualified personnel are permitted to perform work on the device or system.
• Check and wear your personal protective equipment.
NOTICE
• The specified maintenance intervals are standard values and refer to single-shift
operation.
Содержание CAT3 PRO
Страница 4: ...DE 4 BAL 0843 0 2021 02 26 1 Identifikation CAT3 PRO 1 1 EU Konformitätserklärung ...
Страница 26: ...EN 4 BAL 0843 0 2021 02 26 1 Identification CAT3 PRO 1 1 EC declaration of conformity ...
Страница 48: ...FR 4 BAL 0843 0 2021 02 26 1 Identification CAT3 PRO 1 1 Déclaration de conformité CE ...
Страница 70: ...ES 4 BAL 0843 0 2021 02 26 1 Identificación CAT3 PRO 1 1 Declaración de conformidad CE ...
Страница 90: ...BAL 0843 0 2021 02 26 Notizen Notes Notas CAT3 PRO Notizen Notes Notas ...
Страница 91: ...BAL 0843 0 2021 02 26 CAT3 PRO Notizen Notes Notas Notizen Notes Notas ...