ABIMIG
®
GRIP W
7 Putting out of operation
BAL.0192.0 • 2019-03-06
EN - 11
7 Putting out of operation
1
Wait until the shielding gas post-flow time has passed.
2
Close the valve of the shielding gas cylinder.
3
Switch off the power supply.
8 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free
operation.
NOTICE
• When decommissioning the system, ensure that the procedures for switching off the
welding components are observed.
• Liquid-cooled cable assemblies start leaking when overheated. This is why the cooling
unit should continue running for approx. 5 min. after welding.
DANGER
Risk of injury due to unexpected start
The following instructions must be adhered to during all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Close off the gas supply.
• Close off the coolant supply.
• Disconnect the coolant supply and return hoses.
• Disconnect all electrical connections.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.