ABERLINK LTD
|
VATCH LANE
|
EASTCOMBE
|
GLOUCESTERSHIRE
|
GL6 7DY
|
UK
Tel : +44 (0)1453 884461
|
Fax : +44 (0)1453 882348
|
Email : [email protected]
|
Web : www.aberlink.com
Registered in England No. 7642245
|
VAT Registration No. GB 108 3075 37
When air is on,either via controller,
or via pushing the soft black button
on the solenoid you can fit the drive
rod.
Fitting the emergency stop, remove the threaded collar from the switch, then
push the switch through the 16mm hole in the front cover, re-attach the threaded
ring and tighten. Locate the switch block which will be attached to twin core cable
at the end of the energy chain, and push onto the back of the switch (only one
possibility). Supplied with the machine are aluminium sticky clips, use these to
tidy the cable. Push in switch, then rotate to release again.
Locate the drive rod. The end
with the fixed black end cap
goes to the back of the machine.
Once the air is on push the
machine to the front and push
the rod through the small hole in
the barrel. Once through it is
possible to fit the loose end cap.
It is held is place by screwing
through the black disc from end
plate of the machine. To ensure
the rod is aligned with the
machine, push the machine
towards the back and then
tighten the holding screw, then
push to the front, let the rod self
guide, then secure at the front
end.
The rod must be clean with no grease, it relies
on friction, do not oil
For both versions attached the bracket to secure
the energy chain.