Do not instal within 10 feet of a pool, spa or fountain
CAUTION:
fixture(s) must be installed in accordance with all local codes and ordinances.
www.ABBALightingUSA.com
To ensure optimal performance and safety, it is
important to use our fixtures ONLY with a low
voltage
landscape
transformer.
This
transformer reduces the voltage from 120V to
12V, making it safe and suitable for outdoor use.
When installing the fixture(s), please follow
these instructions carefully:
1.Before installation, please ensure that
the power is turned off for your safety.
2.Hold the metal plate against the wall at the
desired height and orientation. Ensure it is level
and aligned according to your preferences.
3.Using a pencil or marker, carefully mark the
screw hole locations on the wall through the
holes in the metal plate.
4.Select an appropriately sized drill bit for the
pilot holes, which should match the diameter of
the screws you are using. It is recommended to
use a bit slightly smaller than the screws to
provide a secure grip.
5.Position the drill bit on each marked spot and
gently drill pilot holes into the wall at the
marked locations. Take care not to drill too
deep, ensuring the depth matches the length of
the screws.
6.To create the necessary hole for the back of
fixture, Use a pencil or marker, carefully mark
the hole on the wall use a drill bit or hole saw
that matches the size of the provided metal
plate. For concrete installation, utilize an
outlet/junction box (not included) suitable for
the purpose. Gently punch the hole on the deck
or use the appropriate outlet/junction box (not
included) for concrete surfaces. Exercise
caution to maintain a clean and neat hole.
We recommend using
WN12
waterproof wire nuts
(sold separately) for optimal connectivity.
12.Strip
the
insulation:
Carefully
strip
approximately 3/4 inch (1.9 cm) of insulation from
the ends of the two wires you wish to connect.
Ensure that the bare metal ends are clean and free
from any frayed strands.
13. Align the wires: Hold the stripped ends of the
two wires together, aligning them neatly and
ensuring that no stray strands are crossing over.
Confirm that the metal plate is firmly and
evenly attached to the wall, without any
wobbling or misalignment.
Use a level to verify that the metal plate is
horizontally or vertically aligned, as desired.
8.Place the metal plate against the wall, aligning
the screw holes with the pilot holes you created.
9.Take the screws and insert them through the
holes in the metal plate, one at a time. For deck
installation, position the metal plate carefully
within the hole.
10.If installing in concrete, secure the Step Light
using the outlet/junction box (not included) you
repared earlier.
11.Using a screwdriver, tighten the screws
gradually and evenly, ensuring a secure
attachment of the metal plate to the wall. Be
cautious not to overtighten and damage the wall
surface.
7.For concrete installation, To begin, construct
conduit raceways inside the concrete formwork by
using one-inch dowels and PVC pipe before pouring
the concrete. After the concrete has cured, remove
the dowels and proceed to finish the outer surface
of each riser if you are installing it in stairs.
INSTALLATION INSTRUCTION