manualshive.com logo in svg
background image

Do not instal within 10 feet of a pool, spa or fountain

CAUTION:

fixture(s) must be installed in accordance with all local codes and ordinances.

www.ABBALightingUSA.com

To ensure optimal performance and safety, it is
important  to  use  our  fixtures  ONLY  with  a  low
voltage 

landscape 

transformer. 

This

transformer  reduces  the  voltage  from  120V  to
12V, making it safe and suitable for outdoor use.

When  installing  the  fixture(s),  please  follow
these instructions carefully:

1.Before  installation,  please  ensure  that                          
the power is turned off for your safety.            

2.Hold  the  metal  plate  against  the  wall  at  the
desired height and orientation. Ensure it is level
and aligned according to your preferences.

3.Using  a  pencil  or  marker,  carefully  mark  the
screw  hole  locations  on  the  wall  through  the
holes in the metal plate.

4.Select  an  appropriately  sized  drill  bit  for  the
pilot holes, which should match the diameter of
the screws you are using. It is recommended to
use  a  bit  slightly  smaller  than  the  screws  to
provide a secure grip.

5.Position the drill bit on each marked spot and
gently  drill  pilot  holes  into  the  wall  at  the
marked  locations.  Take  care  not  to  drill  too
deep, ensuring the depth matches the length of
the screws.
 
6.To  create  the  necessary  hole  for  the  back  of 
 fixture,  Use  a  pencil  or  marker,  carefully  mark
the  hole  on  the  wall  use  a  drill  bit  or  hole  saw
that  matches  the  size  of  the  provided  metal
plate.  For  concrete  installation,  utilize  an
outlet/junction  box  (not  included)  suitable  for
the purpose. Gently punch the hole on the deck
or use the appropriate outlet/junction box (not
included)  for  concrete  surfaces.  Exercise
caution to maintain a clean and neat hole.

We  recommend  using 

WN12 

waterproof  wire  nuts

(sold separately) for optimal connectivity.

12.Strip 

the 

insulation: 

Carefully 

strip

approximately  3/4  inch  (1.9  cm)  of  insulation  from
the  ends  of  the  two  wires  you  wish  to  connect.
Ensure that the bare metal ends are clean and free
from any frayed strands.

13.  Align  the  wires:  Hold  the  stripped  ends  of  the
two  wires  together,  aligning  them  neatly  and
ensuring that no stray strands are crossing over.

 

Confirm  that  the  metal  plate  is  firmly  and
evenly  attached  to  the  wall,  without  any
wobbling or misalignment.
Use  a  level  to  verify  that  the  metal  plate  is
horizontally or vertically aligned, as desired.

8.Place  the  metal  plate  against  the  wall,  aligning
the screw holes with the pilot holes you created.

9.Take  the  screws  and  insert  them  through  the
holes  in  the  metal  plate,  one  at  a  time.  For  deck
installation,  position  the  metal  plate  carefully
within the hole.

10.If  installing  in  concrete,  secure  the  Step  Light
using  the  outlet/junction  box  (not  included)  you
repared earlier.

11.Using  a  screwdriver,  tighten  the  screws
gradually  and  evenly,  ensuring  a  secure
attachment  of  the  metal  plate  to  the  wall.  Be
cautious  not  to  overtighten  and  damage  the  wall
surface.

7.For  concrete  installation,  To  begin,  construct
conduit raceways inside the concrete formwork by
using one-inch dowels and PVC pipe before pouring
the concrete. After the concrete has cured, remove
the dowels and proceed to finish the outer surface
of each riser if you are installing it in stairs. 

INSTALLATION INSTRUCTION

Отзывы: