69
1
O PER AT I O N , M A I N T EN A N C E , A N D I N S TA L L AT I O N G U I D E
Settings (*Default)
Description
Modules (Optional modules) (continued)
O 11/12, O 21/22, O 31/32
Function* Function No
Output disabled
Alarm/Product
Availabilit
Signals any active alarms or ATS being disabled for
automatic transfer operations.
Load Connected to S1
Switch in position I.
Load Disconnected
Switch in position O.
Load Connected to S2
Switch in position II
Pre-transfer Signal 1
Signal is activated and transfer is delayed according to
pre-transfer delay. Signal is kept activated according to
post-transfer delay after transfer.
Pre-transfer Signal 2
Signal is activated and transfer is delayed according to
pre-transfer delay. Signal is kept activated according to
post-transfer delay after transfer.
Pre-transfer Signal 3
Signal is activated and transfer is delayed according to
pre-transfer delay. Signal is kept activated according to
post-transfer delay after transfer.
Pre-transfer Signal 4
Signal is activated and transfer is delayed according to
pre-transfer delay. Signal is kept activated according to
post-transfer delay after transfer.
Source 1 Available
No anomalies in S1 voltage supply.
Source 2 Available
No anomalies in S2 voltage supply.
Load Shed 1
Used for shedding non-essential loads before
transferring to non-priority source. Signal is activated
before transferring to non-priority source according to
load shed delay and kept activated until load is
transferred back to priority source.
Elevator pre-signal 1
Signal is activated and transfer is delayed according to
Elevator pre-signal delay. Signal is kept activated
according to Elevator post-signal delay after transfer.
Elevator pre-signal 2
Signal is activated and transfer is delayed according to
Elevator pre-signal delay. Signal is kept activated
according to Elevator post-signal delay after transfer.
Elevator pre-signal 3
Signal is activated and transfer is delayed according to
Elevator pre-signal delay. Signal is kept activated
according to Elevator post-signal delay after transfer.
Elevator pre-signal 4
Signal is activated and transfer is delayed according to
Elevator pre-signal delay. Signal is kept activated
according to Elevator post-signal delay after transfer.
Contact
Type
NC
Active open
NO*
Active closed
Содержание Zenith ZTS T Series
Страница 2: ...2 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 6: ...6 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 10: ...10 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 36: ...36 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 44: ...44 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 105: ...105 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE Fig 7 9 Figure B C A B Fig 7 8 Figure A A B C ...
Страница 106: ...106 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 108: ...108 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 114: ...2 114 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A Fig 9 5 9 6 R5 Lifting points ...
Страница 122: ...2 122 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 126: ...2 126 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Страница 129: ...129 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...