![ABB XRC G5 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/abb/xrc-g5/xrc-g5_user-manual_3399269036.webp)
36
| XSERIES G5 | 2106026MNAA
WARNING: Bodily injury.
Install electrical wiring according to requirements for the area
classification. Refer to the certification drawing indicated on the device’s name tag, and national
and local codes.
IMPORTANT NOTE:
This procedure applies to the XFC
G5
only. The XRC
G5
does not have onboard
support for RTD inputs.
Materials:
RTD probe with cable and cable gland installed (probe and cable length determined by
technician)
Nylon tie wraps
Install the RTD probe:
Insert the RTD probe into the thermowell to determine the depth setting for the probe
spring.
Figure 3-6: Typical RTD installation
Use snap-ring pliers to adjust the retaining ring below the spring on the probe. Probe depth
should be set so it is spring-loaded against the bottom of the thermowell.
Figure 3-7: RTD probe connector
Legend: RTD Probe Connector
1
SHLD (Drain wire= Green wire)
8
Cable
2
OUT (White wire)
9
Retaining ring
3
(+) (White wire)
10
RTD probe
4
(-) (Black wire)
11
Spring
5
IN (Black wire)
12
Probe connector
6
Cable gland
13
Nylon sealing ring
7
Cord sealing nut
14
Cable nut
Содержание XRC G5
Страница 25: ...2106026MNAA XSERIESG5 25 ...