
2
1VLG5 00007 E
E
All
Satellite reference clock with PRP support
Removal of Coupler adapter AR4
SMV Max delay parameter
UniGear 500R – tested voltage level up to 17.5kV
Protection and control REX640
Updated recommended Managed Ethernet switches
Supported Process bus application extended about voltage sharing
redundancy
2019-02-26
Содержание UniGear Digital
Страница 1: ... DISTRIBUTI ON SOLUTIONS UniGear Family UniGear Digital Engineering Guide ...
Страница 2: ......
Страница 3: ... DISTRIBUTI ON SOLUTIONS UniGear Family UniGear Digital Engineering Guide ...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 67: ...ENGINEERING ETHERNET 1VLG5 00007 E 5 5 Figure74 Communicationmodules with multiple Ethernetconnectors ...
Страница 84: ...72 1VLG5 00007 E Figure94 VirtualLANs allocation in HSR PRP networks ...
Страница 111: ......
Страница 112: ... Visit us www abb com mediumvoltage Document Number 1VLG500007 Rev E ...