![ABB Thomas & Betts Elastimold 252LRJS-IEC Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/abb/thomas-and-betts-elastimold-252lrjs-iec/thomas-and-betts-elastimold-252lrjs-iec_installation-instructions_2034004.webp)
IS--1627
IS--252LRJS--IEC
Revision: 0
Page 4 of 5
STEP 3
ELBOW ASSEMBLY
1.
Clean the cable insulation and inside the elbow housing
and lubricate with the lubricant supplied. DO NOT
SUBSTITUTE. Other lubricants may be harmful to this
product or its mating product(s). Keep insulation clean
of dirt and grime.
2.
Slide the elbow connector onto the cable with a
back and forth twisting motion. Wipe off all excess
lubricant.
3.
Align elbow with compression lug’s threaded hole.
4.
Thread probe into lug by hand, taking care not to
cross--thread. Tighten with wrench until wrench
bends.
STEP 4
ASSEMBLE BAIL
Place hold--down bail in hold--down bracket.
Bracket
Compress Bail &
Insert into Brackets
Bracket
Optional Bail Locator
STEP 5
CONCENTRIC NEUTRAL CONNECTION OR COPPER TAPE
1.
Pull the hood over the concentric neutral seal area on
the cable by pulling the tabs and/or rolling the seal
down.
2.
Using a separate copper wire (No. 14 AWG / 2.5mm)
or equivalent, insert one end through the grounding eye
on the elbow. Twist tightly taking care not to damage
the eye.
3.
Connect copper braid and wire to ground using
appropriate connector. Provide adequate slack in
wires for elbow operation.
Wrench
Twist
Lubricate
Wrench Hole
Probe
Grounding Eye
To Ground
No. 14
Copper Wire
Copper Braid
to Ground